Search / io.github.HorizunGroup/horizun-msproject-mcp
Microsoft Project
L0· runs locallyAudit, reschedule and author Microsoft Project schedules. No Java, no Project install.
v1.6.0 · active · repository · website · descriptor JSON · versions
Search / io.github.HorizunGroup/horizun-msproject-mcp
L0· runs locallyAudit, reschedule and author Microsoft Project schedules. No Java, no Project install.
v1.6.0 · active · repository · website · descriptor JSON · versions
{
"mcpServers": {
"horizun-msproject-mcp": {
"command": "dnx",
"args": [
"[email protected]",
"--yes"
]
}
}
}claude mcp add horizun-msproject-mcp -- dnx [email protected] --yes[mcp_servers.horizun-msproject-mcp]
command = "dnx"
args = ["[email protected]", "--yes"]
{
"$schema": "https://opencode.ai/config.json",
"mcp": {
"horizun-msproject-mcp": {
"type": "local",
"command": [
"dnx",
"[email protected]",
"--yes"
],
"enabled": true
}
}
}{
"mcpServers": {
"horizun-msproject-mcp": {
"command": "dnx",
"args": [
"[email protected]",
"--yes"
]
}
},
"deeplink": "cursor://anysphere.cursor-deeplink/mcp/install?name=horizun-msproject-mcp&config=eyJjb21tYW5kIjoiZG54IiwiYXJncyI6WyJIb3JpenVuTXNQcm9qZWN0TWNwQDEuNi4wIiwiLS15ZXMiXX0%3D"
}{
"servers": {
"horizun-msproject-mcp": {
"type": "stdio",
"command": "dnx",
"args": [
"[email protected]",
"--yes"
]
}
}
}{
"mcpServers": {
"horizun-msproject-mcp": {
"command": "dnx",
"args": [
"[email protected]",
"--yes"
]
}
}
}extensions:
"horizun-msproject-mcp":
enabled: true
name: "horizun-msproject-mcp"
type: stdio
cmd: "dnx"
args:
- "[email protected]"
- "--yes"
timeout: 300
This is a local package: the command runs on your machine.
Not scored: fewer than three checks apply, usually because no remote answered a credential-free probe or the server is a local package.
protocol.modern, protocol.stateless, protocol.transport, protocol.list_ttlno remote answered a protocol handshake (not probed yet, unreachable, or local-only)auth.prm, auth.as_metadata, auth.cimdno remote uses OAuthauth.secret_in_urlno templated URLtools.descriptions, tools.description_length, tools.schemas, tools.annotations, tools.directory_hints, tools.token_cost, tools.api_dumptool list unknown (behind auth, not probed, or empty)stability.changes, stability.rug_pulltool list unknowndeps.known_vulns, deps.mcp_sdk_version, deps.resolvableno npm or PyPI packageNo tool definition changes recorded. A server's first observation is its baseline; later probes record what changes.
Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed. How it is computed.
+repository +namespace-matches-repo +website ~liveness-unmeasured +updated-17d-ago
Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed. How it is computed.
| package | registry | version | runtime | secrets |
|---|---|---|---|---|
HorizunMsProjectMcp | nuget | 1.6.0 | – |
No tools observed. Local packages are never executed by the registry.
Schemas: list_tools.
{
"name": "io.github.HorizunGroup/horizun-msproject-mcp",
"title": "Microsoft Project",
"$schema": "https://static.modelcontextprotocol.io/schemas/2025-12-11/server.schema.json",
"version": "1.6.0",
"packages": [
{
"version": "1.6.0",
"transport": {
"type": "stdio"
},
"identifier": "HorizunMsProjectMcp",
"registryType": "nuget",
"registryBaseUrl": "https://api.nuget.org/v3/index.json"
}
],
"repository": {
"url": "https://github.com/HorizunGroup/horizun-msproject-mcp",
"source": "github"
},
"websiteUrl": "https://github.com/HorizunGroup/horizun-msproject-mcp#readme",
"description": "Audit, reschedule and author Microsoft Project schedules. No Java, no Project install."
}