# Microsoft Project

> Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.

- name: io.github.HorizunGroup/horizun-msproject-mcp
- version: 1.6.1
- connection class: L0 (run_local_package)
- trust: 96/100
- quality: –/100 (not scored)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/io.github.HorizunGroup%2Fhorizun-msproject-mcp
- tools: https://api.protogrid.dev/v1/servers/io.github.HorizunGroup%2Fhorizun-msproject-mcp/tools

**Runs on your machine: something must execute the package.** Only local packages are published (npm, PyPI, OCI, …). The registry never executes them, so tools are unknown until you run it.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "horizun-msproject-mcp": {
      "command": "dnx",
      "args": [
        "HorizunMsProjectMcp@1.6.1",
        "--yes"
      ]
    }
  }
}
```


## Trust

- hygiene: 100
- liveness: n/a
- freshness: 100
- provenance: 90
- drivers: +repository +namespace-matches-repo +website ~liveness-unmeasured +updated-0d-ago
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality –/100 (not scored)

Not scored: fewer than three checks apply, usually because no remote answered a credential-free probe or the server is a local package.

### protocol: n/a (weight 25)

- n/a `protocol.modern`, `protocol.stateless`, `protocol.transport`, `protocol.list_ttl`: no remote answered a protocol handshake (not probed yet, unreachable, or local-only)

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: n/a (weight 30)

- n/a `tools.descriptions`, `tools.description_length`, `tools.schemas`, `tools.annotations`, `tools.directory_hints`, `tools.token_cost`, `tools.api_dump`: tool list unknown (behind auth, not probed, or empty)

### stability: n/a (weight 15)

- n/a `stability.changes`, `stability.rug_pull`: tool list unknown

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: no npm or PyPI package

- tools: unknown
- badge: [![protogrid quality](https://protogrid.dev/badge/io.github.HorizunGroup/horizun-msproject-mcp.svg)](https://protogrid.dev/servers/io.github.HorizunGroup/horizun-msproject-mcp)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Tool changes

_No tool definition changes recorded._

## Remotes

_none_

## Packages

- nuget HorizunMsProjectMcp@1.6.1

## Tools (0)

_none observed_
