protogrid

Search / com.harrowgategroup/tools

Harrowgate Group Tools

R0· no sign-in

Planning tools for commercial paving and site work.

v1.0.0 · active · descriptor JSON · versions

An agent can connect right now, no human step.Remote endpoint, no authentication, reachable on the last probe.
Quality91strong
Trust79of 100
Uptime, 30 days96%
Latency p50198 msp95 2049 ms

Connect

8 clients · secrets stay placeholders
Add to CursorAdd to VS Codeopens the client, which asks before adding the server
{
  "mcpServers": {
    "tools": {
      "type": "http",
      "url": "https://harrowgategroup.com/mcp"
    }
  }
}
claude mcp add --transport http tools https://harrowgategroup.com/mcp
[mcp_servers.tools]
url = "https://harrowgategroup.com/mcp"
{
  "$schema": "https://opencode.ai/config.json",
  "mcp": {
    "tools": {
      "type": "remote",
      "url": "https://harrowgategroup.com/mcp",
      "enabled": true
    }
  }
}
{
  "mcpServers": {
    "tools": {
      "type": "http",
      "url": "https://harrowgategroup.com/mcp"
    }
  },
  "deeplink": "cursor://anysphere.cursor-deeplink/mcp/install?name=tools&config=eyJ0eXBlIjoiaHR0cCIsInVybCI6Imh0dHBzOi8vaGFycm93Z2F0ZWdyb3VwLmNvbS9tY3AifQ%3D%3D"
}
{
  "servers": {
    "tools": {
      "type": "http",
      "url": "https://harrowgategroup.com/mcp"
    }
  },
  "deeplink": "vscode:mcp/install?%7B%22name%22%3A%22tools%22%2C%22type%22%3A%22http%22%2C%22url%22%3A%22https%3A%2F%2Fharrowgategroup.com%2Fmcp%22%7D"
}
{
  "mcpServers": {
    "tools": {
      "httpUrl": "https://harrowgategroup.com/mcp"
    }
  }
}
extensions:
  "tools":
    enabled: true
    name: "tools"
    type: streamable_http
    uri: "https://harrowgategroup.com/mcp"
    timeout: 300

Quality 91 / 100strong

protocol88 · weight 25
  • pass
    protocol.modernsupports 2026-07-28 (server/discover)
  • pass
    protocol.statelessanswers without a session
  • pass
    protocol.transportstreamable HTTP
  • warn
    protocol.list_ttltools/list carries no ttlMs, so clients re-fetch it
authorizationn/a · weight 15
  • n/a
    auth.prm, auth.as_metadata, auth.cimdno remote uses OAuth
  • n/a
    auth.secret_in_urlno templated URL
tool hygiene89 · weight 30
  • pass
    tools.descriptionsevery tool has a description
  • pass
    tools.description_lengthdescriptions are concise
  • pass
    tools.schemasevery tool has an object input schema
  • pass
    tools.annotations12 of 12 tools declare readOnlyHint or destructiveHint
  • fail
    tools.directory_hintsno tool declares all four of readOnlyHint, destructiveHint, idempotentHint and openWorldHint; missing: concrete_slab_thickness_and_reinforcing_guide (destructiveHint); asphalt_concrete_calculator (destructiveHint); trench_shoring_checker (destructiveHint); …
  • pass
    tools.token_costabout 5,044 tokens to load every tool
  • pass
    tools.api_dumptools are not a one-to-one API dump
  • pass
    tools.hidden_textno hidden text in tool names, descriptions, schemas or annotations
  • pass
    tools.poisoningno instructions aimed at the model in tool definitions
stability100 · weight 15
  • pass
    stability.changesno tool changes in 30 days
  • pass
    stability.rug_pullno tool changed its meaning under the same name
  • pass
    stability.new_linksno tool change named a new site
dependenciesn/a · weight 15
  • n/a
    deps.known_vulns, deps.mcp_sdk_version, deps.resolvableno npm or PyPI package

12 tools, about 5,044 tokens to load them all · tool set 3d9e7cdac05a · checked 2026-11-29 14:52 UTC

Definition changes

No changes to tool, prompt or resource template definitions recorded. A server's first observation is its baseline; later probes record what changes.

Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed. How it is computed.

Trust 79 / 100

no-repository
provenance45
liveness98
freshness100
hygiene80

+dns-namespace +reachable +uptime-96% +updated-13d-ago -no-repository

Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed. How it is computed.

Endpoints

Last 30 days96% of probes answered
remoteauthreachableuptime 30dp50p95protocollast ok
https://harrowgategroup.com/mcp streamable-httpnoneyes96%198 ms2049 ms2026-07-28, 2025-11-25, 2025-06-18, 2025-03-26, 2024-11-052026-11-29

Tools (12)

accessible_parking_calculatorread-onlyMinimum accessible parking spaces for a new or redeveloped Ontario lot under Ontario Regulation 191/11 section 80.36, the Type A and Type B split, access aisles and painted stall line length. Every parameter is optional and has a default. Preliminary planning only. Municipal zoning by-laws and the Building Code can add requirements, and the designer of record governs.
asphalt_concrete_calculatorread-onlyTonnes of hot mix asphalt for a paving area, or cubic metres and truck loads of ready-mix concrete for a slab, footing or column. Every parameter is optional and has a default. Material estimate from the numbers entered. It is not a quote and does not include base, forming, reinforcing or site conditions.
concrete_slab_thickness_and_reinforcing_guideread-onlyMinimum slab thickness, subbase, joint spacing, joint depth and reinforcing notes for a walk, patio, driveway, parking lot or truck pad, from published ready-mix concrete association guidance. Every parameter is optional and has a default. Guidance only, not a slab design. Loads, soil, frost, drainage, concrete mix and the municipal or project specification decide the final thickness and reinforcing, and an engineer designs parking lots, truck pads and anything carrying heavy equipment.
curb_sidewalk_concrete_calculatorread-onlyConcrete volume, order quantity and ready-mix truck loads for a run of sidewalk, curb or curb and gutter, with an Ontario accessible path width check. Every parameter is optional and has a default. Preliminary planning only. A volume is one input to a quote; base, forming, reinforcing, joints, drainage and the municipal standard drawing also matter, and the engineer of record governs.
excavation_spoil_volume_calculatorread-onlyBank volume, loose volume after swell and truck loads for a trench or pit, with vertical or sloped walls. Every parameter is optional and has a default. Preliminary planning only. Swell factors are planning values; use your geotechnical figure where you have one. The engineer of record and conditions on site govern.
excess_soil_tracker_and_reuse_site_checkerread-onlyWhich parts of Ontario Regulation 406/19 apply to a soil removal project or a reuse site, and the records to keep, based on soil volume, past land use and where the soil is going. Every parameter is optional and has a default. General information on the regulation, not legal or environmental advice. A qualified person under Ontario Regulation 153/04 prepares the assessments and reports, and the Soil Rules and the Registry forms set the detail. Confirm with your qualified person or the Ministry.
gravel_and_granular_base_calculatorread-onlyTonnes, cubic metres, truck loads and the number of compaction lifts for a Granular A or Granular B base, using the 150 mm lift limit in Toronto standard specification TS 501. Every parameter is optional and has a default. Preliminary planning only. The project specification, the geotechnical report and your supplier's weights govern. The default weight per cubic metre is a general federal stone conversion, not a Granular A or Granular B test result.
hydro_excavation_vs_mechanical_checkerread-onlyWhich excavation method the Electrical Safety Authority guideline allows near a located underground electrical distribution line: hand, vacuum (hydro) or machine. Every parameter is optional and has a default. Preliminary planning only. This covers electrical distribution lines only; gas, communication, water and sewer owners set their own requirements, and the instructions on your locate form govern.
parking_lot_striping_and_stall_layout_calculatorread-onlyStalls per row, rows, total stalls, painted stall line length and the minimum accessible spaces for a lot, using the stall sizes and drive aisle widths in Toronto Zoning By-law 569-2013 and the accessible count in Ontario Regulation 191/11. Every parameter is optional and has a default. Preliminary layout only. Other municipalities set their own stall sizes and aisle widths, and a site plan must meet the zoning by-law, fire route, drainage and accessibility rules that apply to the site. Confirm with your municipality.
rebar_quantity_calculatorread-onlyBar count, total length, stock bars and mass for a slab or pad mat or a strip footing, using CSA G30.18 metric bar sizes. Every parameter is optional and has a default. Preliminary planning only. Take the bar list, cover, laps and hooks from the drawings; the engineer of record governs.
snow_load_and_snow_removal_volume_calculatorread-onlyCubic metres, weight and truck loads of snow from a lot area and snow depth, with the footprint and base width of a snow pile of a chosen height. Every parameter is optional and has a default. Planning estimate only. Real snow varies with temperature, wind, rain and time on the ground, and real piles are windrows, not cones. Weigh or measure loads when it matters, for example for roof loads or truck limits.
trench_shoring_checkerread-onlyWhether Ontario Regulation 213/91 requires a support system for an excavation, by depth, width and soil type, which kinds are permitted, and which other excavation rules apply. Every parameter is optional and has a default. Preliminary planning only. Regulations are amended from time to time; confirm against the current consolidation. The engineer of record and the competent person on site govern.

Schemas: list_tools.

Similar MCP servers

Official server.json
{
  "name": "com.harrowgategroup/tools",
  "title": "Harrowgate Group Tools",
  "$schema": "https://static.modelcontextprotocol.io/schemas/2025-12-11/server.schema.json",
  "remotes": [
    {
      "url": "https://harrowgategroup.com/mcp",
      "type": "streamable-http"
    }
  ],
  "version": "1.0.0",
  "description": "Planning tools for commercial paving and site work."
}