# Harrowgate Group Tools

> Planning tools for commercial paving and site work.

- name: com.harrowgategroup/tools
- version: 1.0.0
- connection class: R0 (autonomous)
- trust: 79/100 flags: no-repository
- quality: 91/100 (strong)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/com.harrowgategroup%2Ftools
- tools: https://api.protogrid.dev/v1/servers/com.harrowgategroup%2Ftools/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "tools": {
      "type": "http",
      "url": "https://harrowgategroup.com/mcp"
    }
  }
}
```


## Trust

- hygiene: 80
- liveness: 98
- freshness: 100
- provenance: 45
- drivers: +dns-namespace +reachable +uptime-96% +updated-13d-ago -no-repository
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 91/100 (strong)

### protocol: 88 (weight 25)

- pass `protocol.modern`: supports 2026-07-28 (server/discover)
- pass `protocol.stateless`: answers without a session
- pass `protocol.transport`: streamable HTTP
- warn `protocol.list_ttl`: tools/list carries no ttlMs, so clients re-fetch it

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 89 (weight 30)

- pass `tools.descriptions`: every tool has a description
- pass `tools.description_length`: descriptions are concise
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 12 of 12 tools declare readOnlyHint or destructiveHint
- fail `tools.directory_hints`: no tool declares all four of readOnlyHint, destructiveHint, idempotentHint and openWorldHint; missing: concrete_slab_thickness_and_reinforcing_guide (destructiveHint); asphalt_concrete_calculator (destructiveHint); trench_shoring_checker (destructiveHint); …
- pass `tools.token_cost`: about 5,044 tokens to load every tool
- pass `tools.api_dump`: tools are not a one-to-one API dump
- pass `tools.hidden_text`: no hidden text in tool names, descriptions, schemas or annotations
- pass `tools.poisoning`: no instructions aimed at the model in tool definitions

### stability: 100 (weight 15)

- pass `stability.changes`: no tool changes in 30 days
- pass `stability.rug_pull`: no tool changed its meaning under the same name
- pass `stability.new_links`: no tool change named a new site

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: no npm or PyPI package

- tools: 12, about 5,044 tokens to load them all
- tool set hash: 3d9e7cdac05a3d6baa67b4080164c492
- badge: [![protogrid quality](https://protogrid.dev/badge/com.harrowgategroup/tools.svg)](https://protogrid.dev/servers/com.harrowgategroup/tools)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Definition changes

_No changes to tool, prompt or resource template definitions recorded._

## Remotes

- https://harrowgategroup.com/mcp (streamable-http, auth none, reachable true, uptime30d 0.9574468)

## Packages

_none_

## Tools (12)

- `accessible_parking_calculator`: Minimum accessible parking spaces for a new or redeveloped Ontario lot under Ontario Regulation 191/11 section 80.36, the Type A and Type B split, access aisles and painted stall line length. Every parameter is optional and has a default. Preliminary planning only. Municipal zoning by-laws and the Building Code can add requirements, and the designer of record governs.
- `asphalt_concrete_calculator`: Tonnes of hot mix asphalt for a paving area, or cubic metres and truck loads of ready-mix concrete for a slab, footing or column. Every parameter is optional and has a default. Material estimate from the numbers entered. It is not a quote and does not include base, forming, reinforcing or site conditions.
- `concrete_slab_thickness_and_reinforcing_guide`: Minimum slab thickness, subbase, joint spacing, joint depth and reinforcing notes for a walk, patio, driveway, parking lot or truck pad, from published ready-mix concrete association guidance. Every parameter is optional and has a default. Guidance only, not a slab design. Loads, soil, frost, drainage, concrete mix and the municipal or project specification decide the final thickness and reinforcing, and an engineer designs parking lots, truck pads and anything carrying heavy equipment.
- `curb_sidewalk_concrete_calculator`: Concrete volume, order quantity and ready-mix truck loads for a run of sidewalk, curb or curb and gutter, with an Ontario accessible path width check. Every parameter is optional and has a default. Preliminary planning only. A volume is one input to a quote; base, forming, reinforcing, joints, drainage and the municipal standard drawing also matter, and the engineer of record governs.
- `excavation_spoil_volume_calculator`: Bank volume, loose volume after swell and truck loads for a trench or pit, with vertical or sloped walls. Every parameter is optional and has a default. Preliminary planning only. Swell factors are planning values; use your geotechnical figure where you have one. The engineer of record and conditions on site govern.
- `excess_soil_tracker_and_reuse_site_checker`: Which parts of Ontario Regulation 406/19 apply to a soil removal project or a reuse site, and the records to keep, based on soil volume, past land use and where the soil is going. Every parameter is optional and has a default. General information on the regulation, not legal or environmental advice. A qualified person under Ontario Regulation 153/04 prepares the assessments and reports, and the Soil Rules and the Registry forms set the detail. Confirm with your qualified person or the Ministry.
- `gravel_and_granular_base_calculator`: Tonnes, cubic metres, truck loads and the number of compaction lifts for a Granular A or Granular B base, using the 150 mm lift limit in Toronto standard specification TS 501. Every parameter is optional and has a default. Preliminary planning only. The project specification, the geotechnical report and your supplier's weights govern. The default weight per cubic metre is a general federal stone conversion, not a Granular A or Granular B test result.
- `hydro_excavation_vs_mechanical_checker`: Which excavation method the Electrical Safety Authority guideline allows near a located underground electrical distribution line: hand, vacuum (hydro) or machine. Every parameter is optional and has a default. Preliminary planning only. This covers electrical distribution lines only; gas, communication, water and sewer owners set their own requirements, and the instructions on your locate form govern.
- `parking_lot_striping_and_stall_layout_calculator`: Stalls per row, rows, total stalls, painted stall line length and the minimum accessible spaces for a lot, using the stall sizes and drive aisle widths in Toronto Zoning By-law 569-2013 and the accessible count in Ontario Regulation 191/11. Every parameter is optional and has a default. Preliminary layout only. Other municipalities set their own stall sizes and aisle widths, and a site plan must meet the zoning by-law, fire route, drainage and accessibility rules that apply to the site. Confirm with your municipality.
- `rebar_quantity_calculator`: Bar count, total length, stock bars and mass for a slab or pad mat or a strip footing, using CSA G30.18 metric bar sizes. Every parameter is optional and has a default. Preliminary planning only. Take the bar list, cover, laps and hooks from the drawings; the engineer of record governs.
- `snow_load_and_snow_removal_volume_calculator`: Cubic metres, weight and truck loads of snow from a lot area and snow depth, with the footprint and base width of a snow pile of a chosen height. Every parameter is optional and has a default. Planning estimate only. Real snow varies with temperature, wind, rain and time on the ground, and real piles are windrows, not cones. Weigh or measure loads when it matters, for example for roof loads or truck limits.
- `trench_shoring_checker`: Whether Ontario Regulation 213/91 requires a support system for an excavation, by depth, width and soil type, which kinds are permitted, and which other excavation rules apply. Every parameter is optional and has a default. Preliminary planning only. Regulations are amended from time to time; confirm against the current consolidation. The engineer of record and the competent person on site govern.
