protogrid

Search / za.co.getestimated/sa-estimate

GetEstimatED — South African building cost estimates

R0· no sign-in

South African building costs: rates, material price index, quick estimates, quote checks, BOQs

v1.0.0 · active · repository · website · descriptor JSON · versions

An agent can connect right now, no human step.Remote endpoint, no authentication, reachable on the last probe.
Quality86new
Trust96of 100
Uptime, 30 days100%
Latency p501450 msp95 2074 ms

Connect

8 clients · secrets stay placeholders
Add to CursorAdd to VS Codeopens the client, which asks before adding the server
{
  "mcpServers": {
    "sa-estimate": {
      "type": "http",
      "url": "https://getestimated.co.za/api/mcp/estimate"
    }
  }
}
claude mcp add --transport http sa-estimate https://getestimated.co.za/api/mcp/estimate
[mcp_servers.sa-estimate]
url = "https://getestimated.co.za/api/mcp/estimate"
{
  "$schema": "https://opencode.ai/config.json",
  "mcp": {
    "sa-estimate": {
      "type": "remote",
      "url": "https://getestimated.co.za/api/mcp/estimate",
      "enabled": true
    }
  }
}
{
  "mcpServers": {
    "sa-estimate": {
      "type": "http",
      "url": "https://getestimated.co.za/api/mcp/estimate"
    }
  },
  "deeplink": "cursor://anysphere.cursor-deeplink/mcp/install?name=sa-estimate&config=eyJ0eXBlIjoiaHR0cCIsInVybCI6Imh0dHBzOi8vZ2V0ZXN0aW1hdGVkLmNvLnphL2FwaS9tY3AvZXN0aW1hdGUifQ%3D%3D"
}
{
  "servers": {
    "sa-estimate": {
      "type": "http",
      "url": "https://getestimated.co.za/api/mcp/estimate"
    }
  },
  "deeplink": "vscode:mcp/install?%7B%22name%22%3A%22sa-estimate%22%2C%22type%22%3A%22http%22%2C%22url%22%3A%22https%3A%2F%2Fgetestimated.co.za%2Fapi%2Fmcp%2Festimate%22%7D"
}
{
  "mcpServers": {
    "sa-estimate": {
      "httpUrl": "https://getestimated.co.za/api/mcp/estimate"
    }
  }
}
extensions:
  "sa-estimate":
    enabled: true
    name: "sa-estimate"
    type: streamable_http
    uri: "https://getestimated.co.za/api/mcp/estimate"
    timeout: 300

Quality 86 / 100new

protocol75 · weight 25
  • warn
    protocol.modernnewest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
  • n/a
    protocol.statelessonly applies to 2026-07-28 servers
  • pass
    protocol.transportstreamable HTTP
  • n/a
    protocol.list_ttlonly applies to 2026-07-28 servers
authorizationn/a · weight 15
  • n/a
    auth.prm, auth.as_metadata, auth.cimdno remote uses OAuth
  • n/a
    auth.secret_in_urlno templated URL
tool hygiene94 · weight 30
  • pass
    tools.descriptionsevery tool has a description
  • warn
    tools.description_length1 tools have descriptions over 1,024 characters, which crowds the context
  • pass
    tools.schemasevery tool has an object input schema
  • pass
    tools.annotations11 of 11 tools declare readOnlyHint or destructiveHint
  • pass
    tools.directory_hintsevery tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
  • pass
    tools.token_costabout 3,608 tokens to load every tool
  • pass
    tools.api_dumptools are not a one-to-one API dump
  • pass
    tools.hidden_textno hidden text in tool names, descriptions, schemas or annotations
  • pass
    tools.poisoningno instructions aimed at the model in tool definitions
stabilityn/a · weight 15
  • n/a
    stability.changes, stability.rug_pull, stability.new_linkstool history recorded for 3 of the 7 days needed
dependenciesn/a · weight 15
  • n/a
    deps.known_vulns, deps.mcp_sdk_version, deps.resolvableno npm or PyPI package

11 tools, about 3,608 tokens to load them all · tool set db1646c41231 · tools last changed 2026-11-28 · checked 2026-11-29 14:15 UTC

Definition changes

  • sa_architect_fee_estimateaddedno new version

    South African architect's professional fee from the SACAP Guideline for Professional Fees (Board Notice 885 of 2026): the project cost-based fee for low, medium or high complexity, split over the six SACAP work stages, for a full service or up to a chosen stage (e.g. "4.1" = up to the drawings for municipal submission). Give the value of the building works excl. VAT, or a floor area (with quality class and province) and the construction cost is estimated first from the AECOM cost guide rate per m². Also lists the SACAP guideline hourly rates for time-based work. A guideline — architects and clients agree the actual fee.

  • top_up_walletchangedannotationsno new version
  • estimate_from_briefchangedannotationsno new version
  • buy_estimate_packremovedno new version

    Buys estimate credits for the user's GetEstimatED account: pack_10 = 10 AI estimates for R399, pack_1 = 1 AI estimate for R49 (once-off, VAT included, South African rand). TWO STEPS: the first call returns the price and what they get plus a confirm_token; after the user agrees, the second call (same arguments + confirm_token) returns a secure Paystack payment link for the user to open and pay. The credits are added as soon as Paystack confirms the payment, and a tax invoice is emailed. GetEstimatED Pro accounts do not need packs (unlimited). Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

  • top_up_walletaddedno new version

    Adds money to the user's GetEstimatED pay-as-you-go wallet: topup_100 = R100, topup_250 = R250, topup_500 = R500, topup_1000 = R1 000 (VAT included, South African rand). TWO STEPS: the first call returns the amount and the balance after paying plus a confirm_token; after the user agrees, the second call (same arguments + confirm_token) returns a secure Paystack payment link for the user to open and pay. The wallet is credited as soon as Paystack confirms the payment, and a tax invoice is emailed. GetEstimatED Pro accounts do not need a wallet (unlimited). Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

  • wallet_balanceaddedno new version

    Shows the user's pay-as-you-go wallet: the balance in rand and the last top-ups and estimates (rand amounts only). Pro accounts are unlimited and have no wallet. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

  • estimate_from_briefchangeddescription, input schemano new version
    before

    Makes a new early-stage cost estimate (a priced bill of quantities by Estie, GetEstimatED's estimator) from a written brief — no drawings needed — in a new project in the user's own account. TWO STEPS: the first call changes nothing and returns a preview (what will be priced, province, quality class, and whether it uses one of their estimate credits — Pro accounts are unlimited) plus a confirm_token; only after the user agrees, call again with exactly the same arguments plus confirm_token (valid 10 minutes, single use). The estimate takes a few minutes: the second call returns the project_id — then call get_my_bill to fetch the totals and the PDF / Excel links. Without credits it explains how to buy a pack (buy_estimate_pack). Provinces: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Quality classes: economic, standard, middle, luxury, exclusive, super_luxury. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

    after · 63% of words in common

    Makes a new early-stage cost estimate (a priced bill of quantities by Estie, GetEstimatED's estimator) from a written brief — no drawings needed — in a new project in the user's own account. TWO STEPS: the first call changes nothing and returns a preview (what will be priced, province, quality class, and the PRICE in rand — up to about R X, which is also the most they can be charged — against their wallet balance; Pro accounts are unlimited and are not charged from a wallet) plus a confirm_token; only after the user agrees, call again with exactly the same arguments plus confirm_token (valid 10 minutes, single use). The estimate takes a few minutes: the second call returns the project_id — then call get_my_bill to fetch the totals and the PDF / Excel links. The user pays only what the estimate actually costs, at least R15, never more than the price shown; a failed run costs nothing. If the wallet is below the price, nothing runs and top_up_wallet adds money (R100, R250, R500 or R1 000). Very large jobs are refused: split them per building or ask GetEstimatED for a quote. Provinces: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Quality classes: economic, standard, middle, luxury, exclusive, super_luxury. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

  • list_my_projectschangeddescriptionno new version
    before

    Lists the projects in the user's own GetEstimatED account with each project's latest estimate (status, total incl. VAT when ready) and the estimate credits left. Use it first to find a project_id. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

    after · 88% of words in common

    Lists the projects in the user's own GetEstimatED account with each project's latest estimate (status, total incl. VAT when ready) and the wallet balance in rand. Use it first to find a project_id. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

Full history: list_changes · trend: quality JSON.

Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed. How it is computed.

Trust 96 / 100

provenance85
liveness100
freshness100
hygiene100

+repository +dns-namespace +website +reachable +uptime-100% +updated-3d-ago

Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed. How it is computed.

Endpoints

Last 30 days100% of probes answered
remoteauthreachableuptime 30dp50p95protocollast ok
https://getestimated.co.za/api/mcp/estimate streamable-httpnoneyes100%1450 ms2074 ms2025-11-252026-11-29

Tools (11)

compare_bill_to_quoteread-onlyCompares a builder's or subcontractor's quote, line by line, with the user's OWN estimate for that project: each quote line is matched to the closest item of the same unit in the estimate and marked below / in line / above (in line = 20% below to 25% above the estimate's rate). Lines without a match, and lump sums, are listed, not guessed. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
estimate_from_briefdestructiveMakes a new early-stage cost estimate (a priced bill of quantities by Estie, GetEstimatED's estimator) from a written brief — no drawings needed — in a new project in the user's own account. TWO STEPS: the first call changes nothing and returns a preview (what will be priced, province, quality class, and the PRICE in rand — up to about R X, which is also the most they can be charged — against their wallet balance; Pro accounts are unlimited and are not charged from a wallet) plus a confirm_token; only after the user agrees, call again with exactly the same arguments plus confirm_token (valid 10 minutes, single use). The estimate takes a few minutes: the second call returns the project_id — then call get_my_bill to fetch the totals and the PDF / Excel links. The user pays only what the estimate actually costs, at least R15, never more than the price shown; a failed run costs nothing. If the wallet is below the price, nothing runs and top_up_wallet adds money (R100, R250, R500 or R1 000). Very large jobs are refused: split them per building or ask GetEstimatED for a quote. Provinces: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Quality classes: economic, standard, middle, luxury, exclusive, super_luxury. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
get_my_billread-onlyReturns one of the user's own estimates (bill of quantities made by Estie): totals excl./incl. VAT with the likely range, contingency, the value per trade, how much of it is priced, and links to download the PDF and Excel (valid 24 hours). If the estimate is still being made it says so — ask again in a minute. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
list_my_projectsread-onlyLists the projects in the user's own GetEstimatED account with each project's latest estimate (status, total incl. VAT when ready) and the wallet balance in rand. Use it first to find a project_id. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
sa_architect_fee_estimateread-onlySouth African architect's professional fee from the SACAP Guideline for Professional Fees (Board Notice 885 of 2026): the project cost-based fee for low, medium or high complexity, split over the six SACAP work stages, for a full service or up to a chosen stage (e.g. "4.1" = up to the drawings for municipal submission). Give the value of the building works excl. VAT, or a floor area (with quality class and province) and the construction cost is estimated first from the AECOM cost guide rate per m². Also lists the SACAP guideline hourly rates for time-based work. A guideline — architects and clients agree the actual fee.
sa_building_rate_lookupread-onlyApproximate all-in South African building rate for an item of work (materials + labour + plant + contractor margin, excl. VAT) per unit, e.g. "230 mm brick wall" per m², "concrete strip footing" per m³, "IBR roof sheeting" per m², "ceramic floor tiles" per m². Adjusted for the province and, for finish items, the quality class. From GetEstimatED's own rate guide 2026 — a guide for budgeting, not a quotation.
sa_check_quoteread-onlyChecks the line rates in a South African building or repair quote against GetEstimatED's rate guide: each recognised line is marked below, in or above the usual range for the province and quality class, with the guide rate, and the recognised lines are totalled. Useful to homeowners, architects, brokers and assessors before accepting a quote. Lines it cannot recognise are listed, not guessed.
sa_material_price_indexread-onlyIndicative South African retail price of a building material (cement, bricks, sand, timber, roof sheeting, ceiling board, paint, tiles, sanitaryware …): the median price per unit incl. VAT, the month and how many products it is based on — for one province, or for all nine provinces side by side (province "all"). An industry pricing indicator, not a quote from a supplier.
sa_quick_estimateread-onlyBallpark cost to build a house (or an addition) in South Africa from its floor area: low, expected and high in rand, excl. and incl. VAT, from the published rate per m² for the quality class (AECOM Africa Property & Construction Cost Guide 2025/26, private dwelling houses) adjusted for the province. Excludes site works, professional fees, municipal fees and escalation. A first budget figure — a bill of quantities priced for the actual plans is needed for a reliable price.
top_up_walletdestructiveAdds money to the user's GetEstimatED pay-as-you-go wallet: topup_100 = R100, topup_250 = R250, topup_500 = R500, topup_1000 = R1 000 (VAT included, South African rand). TWO STEPS: the first call returns the amount and the balance after paying plus a confirm_token; after the user agrees, the second call (same arguments + confirm_token) returns a secure Paystack payment link for the user to open and pay. The wallet is credited as soon as Paystack confirms the payment, and a tax invoice is emailed. GetEstimatED Pro accounts do not need a wallet (unlimited). Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).
wallet_balanceread-onlyShows the user's pay-as-you-go wallet: the balance in rand and the last top-ups and estimates (rand amounts only). Pro accounts are unlimited and have no wallet. Read-only. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

Schemas: list_tools.

Similar MCP servers

Official server.json
{
  "name": "za.co.getestimated/sa-estimate",
  "icons": [
    {
      "src": "https://getestimated.co.za/icon-512.png",
      "sizes": [
        "512x512"
      ],
      "theme": "light",
      "mimeType": "image/png"
    }
  ],
  "title": "GetEstimatED — South African building cost estimates",
  "$schema": "https://static.modelcontextprotocol.io/schemas/2025-12-11/server.schema.json",
  "remotes": [
    {
      "url": "https://getestimated.co.za/api/mcp/estimate",
      "type": "streamable-http"
    }
  ],
  "version": "1.0.0",
  "repository": {
    "url": "https://github.com/Getkonnekted-AI/getestimated-mcp",
    "source": "github"
  },
  "websiteUrl": "https://getestimated.co.za/",
  "description": "South African building costs: rates, material price index, quick estimates, quote checks, BOQs"
}