Search / uk.landbng/landbng
LandBNG
not classifiedBNG income and cost estimates for land in England, GB grid headroom and planning history
v1.0.0 · active · website · descriptor JSON · versions
Search / uk.landbng/landbng
BNG income and cost estimates for land in England, GB grid headroom and planning history
v1.0.0 · active · website · descriptor JSON · versions
{
"mcpServers": {
"landbng": {
"type": "http",
"url": "https://landbng.uk/mcp"
}
}
}claude mcp add --transport http landbng https://landbng.uk/mcp[mcp_servers.landbng]
url = "https://landbng.uk/mcp"
{
"$schema": "https://opencode.ai/config.json",
"mcp": {
"landbng": {
"type": "remote",
"url": "https://landbng.uk/mcp",
"enabled": true
}
}
}{
"mcpServers": {
"landbng": {
"type": "http",
"url": "https://landbng.uk/mcp"
}
},
"deeplink": "cursor://anysphere.cursor-deeplink/mcp/install?name=landbng&config=eyJ0eXBlIjoiaHR0cCIsInVybCI6Imh0dHBzOi8vbGFuZGJuZy51ay9tY3AifQ%3D%3D"
}{
"servers": {
"landbng": {
"type": "http",
"url": "https://landbng.uk/mcp"
}
}
}{
"mcpServers": {
"landbng": {
"httpUrl": "https://landbng.uk/mcp"
}
}
}extensions:
"landbng":
enabled: true
name: "landbng"
type: streamable_http
uri: "https://landbng.uk/mcp"
timeout: 300
protocol.modernprotocol.statelessprotocol.transportprotocol.list_ttlauth.prm, auth.as_metadata, auth.cimdauth.secret_in_urltools.descriptionstools.description_lengthtools.schemastools.annotationstools.directory_hintstools.token_costtools.api_dumptools.hidden_textstability.changesstability.rug_pullstability.new_linksdeps.known_vulns, deps.mcp_sdk_version, deps.resolvableestimate_bng_costchangedtitle, annotationsestimate_bng_incomechangedtitle, description, annotationsEstimate 30-year lump-sum BNG income (LOW/MID/HIGH) for dedicating `area_ha` hectares of an England parcel to biodiversity net gain habitat creation, from LandBNG planning assumptions per habitat capped at the Defra statutory credit price; local factors (flood zone, SSSI, Green Belt, NSIP demand, Ancient Woodland, AONB, Agricultural Land Class) are listed, not priced. England only. Free, no key.
Estimate 30-year lump-sum BNG income (LOW/MID/HIGH) for dedicating `area_ha` hectares of an England parcel to biodiversity net gain habitat creation, from LandBNG planning assumptions per habitat capped at the Defra statutory credit price; local factors (flood zone, SSSI, Green Belt, Ancient Woodland, AONB, Agricultural Land Class, nearby NSIP projects and how many fall under mandatory BNG) are listed, not priced. England only. Free, no key.
check_planning_historychangedtitle, annotationscheck_grid_connectionchangedtitle, description, annotationsCheck nearest UK electricity Distribution Network Operator (DNO) grid connection headroom for a location — generation/demand headroom (MW/MVA), RAG status, voltage, and a combined BNG+grid siting signal. Covers all of Great Britain (England/Scotland/Wales), not just England. Free, no key.
Check nearest UK electricity Distribution Network Operator (DNO) grid connection headroom for a location: generation/demand headroom (MW/MVA), RAG status, voltage, and a combined BNG+grid siting signal. Covers all of Great Britain (England/Scotland/Wales), not just England. Free, no key.
Full history: list_changes · trend: quality JSON.
Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed. How it is computed.
+dns-namespace +website -unreachable(1 failures) +updated-19d-ago -no-repository
Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed. How it is computed.
| remote | auth | reachable | uptime 30d | p50 | protocol | last ok |
|---|---|---|---|---|---|---|
https://landbng.uk/mcp streamable-http | none | no (1 failures) | 90% | 636 ms | 2025-11-25 | 2026-11-13 |
check_grid_connectionread-only | Check nearest UK electricity Distribution Network Operator (DNO) grid connection headroom for a location: generation/demand headroom (MW/MVA), RAG status, voltage, and a combined BNG+grid siting signal. Covers all of Great Britain (England/Scotland/Wales), not just England. Free, no key. |
check_planning_historyread-only | Find planning applications near a UK location, via UK PlanIt's public aggregator (over 400 UK planning authorities). Free, no key. radius_km must be between 0.1 and 5.0. |
estimate_bng_costread-only | Estimate the cost of meeting England's mandatory 10% biodiversity net gain requirement for a development scheme of `scheme_ha` hectares, across 3 procurement routes (off-site habitat bank mosaic, off-site grassland/ heathland, statutory biodiversity credits, priced per unit at two Defra credits per unit), and the units to buy from a gain site in the same, a neighbouring or a further authority (spatial risk multiplier 1.0 / 0.75 / 0.5, with this point's authority names). land_type: brownfield / arable / improved / semi_improved / mixed. England only. Free, no key. |
estimate_bng_incomeread-only | Estimate 30-year lump-sum BNG income (LOW/MID/HIGH) for dedicating `area_ha` hectares of an England parcel to biodiversity net gain habitat creation, from LandBNG planning assumptions per habitat capped at the Defra statutory credit price; local factors (flood zone, SSSI, Green Belt, Ancient Woodland, AONB, Agricultural Land Class, nearby NSIP projects and how many fall under mandatory BNG) are listed, not priced. England only. Free, no key. |
Schemas: list_tools.
{
"name": "uk.landbng/landbng",
"title": "LandBNG",
"$schema": "https://static.modelcontextprotocol.io/schemas/2025-12-11/server.schema.json",
"remotes": [
{
"url": "https://landbng.uk/mcp",
"type": "streamable-http"
}
],
"version": "1.0.0",
"websiteUrl": "https://landbng.uk/",
"description": "BNG income and cost estimates for land in England, GB grid headroom and planning history"
}