protogrid

Search / ca.entogo/knowledge

Entogo power-equipment knowledge & tools

R0· no sign-in

Entogo (Canada) transformers, switchgear, BESS, EV charging: catalogue, lead times, EV sizing, RFQ

v1.0.0 · active · website · descriptor JSON · versions

An agent can connect right now, no human step.Remote endpoint, no authentication, reachable on the last probe.
Quality80good
Trust79of 100
Uptime, 30 days96%
Latency p50623 ms

Connect

8 clients · secrets stay placeholders
{
  "mcpServers": {
    "knowledge": {
      "type": "http",
      "url": "https://entogo.ca/mcp"
    }
  }
}
claude mcp add --transport http knowledge https://entogo.ca/mcp
[mcp_servers.knowledge]
url = "https://entogo.ca/mcp"
{
  "$schema": "https://opencode.ai/config.json",
  "mcp": {
    "knowledge": {
      "type": "remote",
      "url": "https://entogo.ca/mcp",
      "enabled": true
    }
  }
}
{
  "mcpServers": {
    "knowledge": {
      "type": "http",
      "url": "https://entogo.ca/mcp"
    }
  },
  "deeplink": "cursor://anysphere.cursor-deeplink/mcp/install?name=knowledge&config=eyJ0eXBlIjoiaHR0cCIsInVybCI6Imh0dHBzOi8vZW50b2dvLmNhL21jcCJ9"
}
{
  "servers": {
    "knowledge": {
      "type": "http",
      "url": "https://entogo.ca/mcp"
    }
  }
}
{
  "mcpServers": {
    "knowledge": {
      "httpUrl": "https://entogo.ca/mcp"
    }
  }
}
extensions:
  "knowledge":
    enabled: true
    name: "knowledge"
    type: streamable_http
    uri: "https://entogo.ca/mcp"
    timeout: 300

Quality 80 / 100good

protocol75 · weight 25
  • warn
    protocol.modernnewest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
  • n/a
    protocol.statelessonly applies to 2026-07-28 servers
  • pass
    protocol.transportstreamable HTTP
  • n/a
    protocol.list_ttlonly applies to 2026-07-28 servers
authorizationn/a · weight 15
  • n/a
    auth.prm, auth.as_metadata, auth.cimdno remote uses OAuth
  • n/a
    auth.secret_in_urlno templated URL
tool hygiene86 · weight 30
  • pass
    tools.descriptionsevery tool has a description
  • pass
    tools.description_lengthdescriptions are concise
  • pass
    tools.schemasevery tool has an object input schema
  • pass
    tools.annotations7 of 7 tools declare readOnlyHint or destructiveHint
  • fail
    tools.directory_hintsno tool declares all four of readOnlyHint, destructiveHint, idempotentHint and openWorldHint; missing: get_product (destructiveHint, idempotentHint); get_lead_time (destructiveHint, idempotentHint); search_knowledge (destructiveHint, idempotentHint); …
  • pass
    tools.token_costabout 1,763 tokens to load every tool
  • pass
    tools.api_dumptools are not a one-to-one API dump
stability75 · weight 15
  • warn
    stability.changes6 tool changes in 30 days
  • pass
    stability.rug_pullno tool changed its meaning under the same name
dependenciesn/a · weight 15
  • n/a
    deps.known_vulns, deps.mcp_sdk_version, deps.resolvableno npm or PyPI package

7 tools, about 1,763 tokens to load them all · tool set c2aa924c0845 · tools last changed 2026-10-09 · checked 2026-10-19 10:52 UTC

Tool changes

  • request_quote_handoffchangedinput schema
  • get_lead_timechangedinput schema
  • request_quote_handoffchangedinput schema
  • get_lead_timechangedinput schema
  • list_productschangedinput schema
  • get_lead_timechangeddescription
    before

    Delivery lead-time band for a product (weeks, purchase order to shipment) plus Entogo's company-wide lead-time and warranty commitments. Bands: catalogue EV chargers 4–8, medium manufactured equipment 12–18, large engineered-to-order systems 16–24 weeks; new UL / CSA certification can extend a band within a guaranteed 36-week worst case.

    after · 71% of words in common

    Delivery lead-time band for a product (weeks, purchase order to shipment) plus Entogo's company-wide lead-time and warranty commitments. Bands: catalogue EV chargers 4–8, medium manufactured equipment 16–24, large engineered-to-order systems 16–24 weeks; new cULus / CSA certification can extend a band, to within 36 weeks when the order needs it. IEC/CE equipment built for export markets: about 12 weeks.

Full history: list_changes · trend: quality JSON.

Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed. How it is computed.

Trust 79 / 100

no-repository
provenance55
liveness99
freshness85
hygiene80

+dns-namespace +website +reachable +uptime-96% ~updated-44d-ago -no-repository

Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed. How it is computed.

Endpoints

remoteauthreachableuptime 30dp50protocollast ok
https://entogo.ca/mcp streamable-httpnoneyes96%623 ms2025-11-252026-10-19

Tools (7)

estimate_ev_charging_capacityread-onlyRuns the same engine as https://entogo.ca/tools/ev-charging-service-capacity-calculator/: code load (NEC 2023 / NEC 2026 / CEC 2024 Section 86) for a set of Level 2 and DC fast chargers, EMS-managed load when an energy management system is declared, planning-basis load with site diversity, recommended transformer kVA and service / switchboard rating, and a GREEN / YELLOW / RED verdict against an existing service when one is given. Planning estimate only.
get_company_factsread-onlyVerified company facts: legal name, founding, headquarters, contacts and office hours, factory and capacity narrative, lead-time and warranty commitments, certifications, standards position, quote channel and key URLs.
get_lead_timeread-onlyDelivery lead-time band for a product (weeks, purchase order to shipment) plus Entogo's company-wide lead-time and warranty commitments. Bands: catalogue EV chargers 4–8, medium manufactured equipment 16–24, large engineered-to-order systems 16–24 weeks; new cULus / CSA certification can extend a band, to within 36 weeks when the order needs it. IEC/CE equipment built for export markets: about 12 weeks.
get_productread-onlyFull record for one product by catalogue id (slug): specifications, features, applications, FAQs, certifications listed on the page, lead-time band, language editions, Markdown twin and the quote channel.
list_productsread-onlyList products in the catalogue, optionally filtered by category (power = transformers & substations; distribution = switchgear & distribution; storage = battery energy storage; emobility = EV charging & PV-storage-charging) and/or a keyword. Returns compact rows; call get_product for full specifications.
request_quote_handoffread-onlyReturns the right channel for a request for quotation (RFQ): the transformer configurator deep link (pre-filled with the product name), the contact page, e-mail and phone numbers, office hours and the one-business-day response commitment. This tool stores nothing and sends nothing — the user completes the request on entogo.ca or by e-mail.
search_knowledgeread-onlySemantic search over Entogo's product, solution, manufacturing, certification, lead-time and warranty knowledge (the same index that grounds the Ensight assistant). Returns the best-matching passages with source URLs.

Schemas: list_tools.

Similar MCP servers

Official server.json
{
  "name": "ca.entogo/knowledge",
  "title": "Entogo power-equipment knowledge & tools",
  "$schema": "https://static.modelcontextprotocol.io/schemas/2025-12-11/server.schema.json",
  "remotes": [
    {
      "url": "https://entogo.ca/mcp",
      "type": "streamable-http"
    }
  ],
  "version": "1.0.0",
  "websiteUrl": "https://entogo.ca/",
  "description": "Entogo (Canada) transformers, switchgear, BESS, EV charging: catalogue, lead times, EV sizing, RFQ"
}