# BRAINIAC Vendor & Contractor Compliance

> Paid Vendor & Contractor Compliance API via x402. Unpaid tool calls return 402.

- name: software.brainiac/vendor-compliance
- version: 1.0.1
- connection class: R0 (autonomous)
- trust: 83/100 flags: no-repository
- quality: 78/100 (good)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/software.brainiac%2Fvendor-compliance
- tools: https://api.protogrid.dev/v1/servers/software.brainiac%2Fvendor-compliance/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "vendor-compliance": {
      "type": "http",
      "url": "https://www.brainiac.software/mcp/vendor-compliance"
    }
  }
}
```


## Trust

- hygiene: 80
- liveness: 100
- freshness: 100
- provenance: 55
- drivers: +dns-namespace +website +reachable +uptime-100% +updated-10d-ago -no-repository
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 78/100 (good)

### protocol: 75 (weight 25)

- warn `protocol.modern`: newest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
- n/a `protocol.stateless`: only applies to 2026-07-28 servers
- pass `protocol.transport`: streamable HTTP
- n/a `protocol.list_ttl`: only applies to 2026-07-28 servers

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 94 (weight 30)

- pass `tools.descriptions`: every tool has a description
- pass `tools.description_length`: descriptions are concise
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 7 of 7 tools declare readOnlyHint or destructiveHint
- pass `tools.directory_hints`: every tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
- warn `tools.token_cost`: about 11,968 tokens to load every tool
- pass `tools.api_dump`: tools are not a one-to-one API dump
- pass `tools.hidden_text`: no hidden text in tool names, descriptions, schemas or annotations
- pass `tools.poisoning`: no instructions aimed at the model in tool definitions

### stability: 50 (weight 15)

- warn `stability.changes`: 19 tool changes in 30 days
- fail `stability.rug_pull`: 11 tools kept their name but changed most of their description in 30 days; review before trusting them
- pass `stability.new_links`: no tool change named a new site

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: no npm or PyPI package

- tools: 7, about 11,968 tokens to load them all
- tool set hash: 029d18e0497bf6990a39ecde0b914275
- tools last changed: 2026-11-25T18:33:52.786Z
- badge: [![protogrid quality](https://protogrid.dev/badge/software.brainiac/vendor-compliance.svg)](https://protogrid.dev/servers/software.brainiac/vendor-compliance)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Definition changes

- 2026-11-25 `contact_us` added no new version (still 1.0.0)
  - How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
- 2026-11-23 `vendor-compliance_contractor-closeout-check` changed (description, outputSchema) **meaning changed**
  - before: Compare buyer closeout requirements with supplied documents and attestations before you onboard or pay a vendor. A passing result does not certify that the project is complete. Call with requirements; optional asOf, projectName, vendor, documents, attestations. Returns checkedAt, asOf, purpose, projectName, vendor, assessment, blocksWorkflow, summary, counts, findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, requirements, asOf, projectName, vendor, documents, attestations, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Check contractor closeout.
  - after: Compare buyer closeout requirements with supplied documents and attestations. Docs: https://www.brainiac.software/api/vendor-compliance/contractor-closeout-check Keywords: before you onboard or pay a vendor, requirements, asOf, projectName, vendor, documents, attestations, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Check contractor closeout.
- 2026-11-23 `vendor-compliance_report` changed (description, outputSchema) **meaning changed**
  - before: Consolidate supplied vendor information, documents, attestations, evidence, and open items into one requirements report before you onboard or pay a vendor. External registries are not contacted. Call with optional asOf, projectName, vendor, documents, requirements, attestations and others. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, asOf, projectName, vendor, documents, requirements, attestations, evidence, openItems, checkedAt, purpose, assessment, blocksWorkflow, summary, counts.
  - after: Consolidate supplied vendor information, documents, attestations, evidence, and open items into one requirements report. Docs: https://www.brainiac.software/api/vendor-compliance/report Keywords: before you onboard or pay a vendor, asOf, projectName, vendor, documents, requirements, attestations, evidence, openItems, checkedAt, purpose, assessment, blocksWorkflow, summary, counts.
- 2026-11-23 `vendor-compliance_document-completeness` changed (description, outputSchema) **meaning changed**
  - before: Compare a supplied document inventory with a buyer requirements list before you onboard or pay a vendor. Files are not fetched, and a present document is not treated as verified content. Call with documents and requirements; optional asOf, projectName. Returns checkedAt, asOf, purpose, projectName, vendor, assessment, blocksWorkflow, summary, counts, findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, documents, requirements, asOf, projectName, checkedAt, purpose, vendor, assessment, blocksWorkflow, summary, counts, findings, Check vendor document completeness, document completeness.
  - after: Compare a supplied document inventory with a buyer requirements list. Docs: https://www.brainiac.software/api/vendor-compliance/document-completeness Keywords: before you onboard or pay a vendor, documents, requirements, asOf, projectName, checkedAt, purpose, vendor, assessment, blocksWorkflow, summary, counts, findings, Check vendor document completeness, document completeness.
- 2026-11-23 `vendor-compliance_subcontractor-payment-readiness` changed (description, outputSchema) **meaning changed**
  - before: List missing payment documents and caller-supplied open items before you onboard or pay a vendor. This check does not release a payment or rerun sanctions, wage, or certificate screens. Call with requirements; optional asOf, projectName, vendor, documents, openItems. Returns checkedAt, asOf, purpose, projectName, vendor, assessment, blocksWorkflow, summary, counts, findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: watchlist screen, sanctions list, denied party, before you onboard or pay a vendor, requirements, asOf, projectName, vendor, documents, openItems, checkedAt, purpose, assessment, blocksWorkflow, summary.
  - after: List missing payment documents and caller-supplied open items. Docs: https://www.brainiac.software/api/vendor-compliance/subcontractor-payment-readiness Keywords: watchlist screen, sanctions list, denied party, before you onboard or pay a vendor, requirements, asOf, projectName, vendor, documents, openItems, checkedAt, purpose, assessment, blocksWorkflow, summary.
- 2026-11-23 `vendor-compliance_contractor-prequalification` changed (description, outputSchema) **meaning changed**
  - before: Compare buyer qualification criteria with supplied vendor facts, documents, and evidence before you onboard or pay a vendor. The result does not award eligibility or query a registry. Call with vendor and requirements; optional asOf, projectName, documents, evidence. Returns checkedAt, asOf, purpose, projectName, vendor, assessment, blocksWorkflow, summary, counts, findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, vendor, requirements, asOf, projectName, documents, evidence, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Prequalify a contractor.
  - after: Compare buyer qualification criteria with supplied vendor facts, documents, and evidence. Docs: https://www.brainiac.software/api/vendor-compliance/contractor-prequalification Keywords: before you onboard or pay a vendor, vendor, requirements, asOf, projectName, documents, evidence, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Prequalify a contractor.
- 2026-11-23 `vendor-compliance_onboarding-precheck` changed (description, outputSchema)
  - before: Compare a supplied vendor record, document list, and attestations with the buyer requirements before you onboard or pay a vendor. Missing, expired, failed, and unverified items are reported separately. Call with vendor; optional asOf, projectName, documents, requirements, attestations. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, vendor, asOf, projectName, documents, requirements, attestations, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Precheck vendor onboarding.
  - after: Compare a supplied vendor record, document list, and attestations with the buyer requirements. Docs: https://www.brainiac.software/api/vendor-compliance/onboarding-precheck Keywords: before you onboard or pay a vendor, vendor, asOf, projectName, documents, requirements, attestations, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Precheck vendor onboarding.
- 2026-11-20 `vendor-compliance_contractor-closeout-check` changed (description) **meaning changed**
  - before: Compare buyer closeout requirements with supplied documents and attestations. A passing result does not certify that the project is complete. Price $0.04 USDC. POST /api/v1/vendor-compliance/contractor-closeout-check. An unpaid call returns the x402 payment terms and does not run.
  - after: Compare buyer closeout requirements with supplied documents and attestations before you onboard or pay a vendor. A passing result does not certify that the project is complete. Call with requirements; optional asOf, projectName, vendor, documents, attestations. Returns checkedAt, asOf, purpose, projectName, vendor, assessment, blocksWorkflow, summary, counts, findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, requirements, asOf, projectName, vendor, documents, attestations, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Check contractor closeout.
- 2026-11-20 `vendor-compliance_report` changed (description) **meaning changed**
  - before: Consolidate supplied vendor information, documents, attestations, evidence, and open items into one requirements report. External registries are not contacted. Price $0.08 USDC. POST /api/v1/vendor-compliance/report. An unpaid call returns the x402 payment terms and does not run.
  - after: Consolidate supplied vendor information, documents, attestations, evidence, and open items into one requirements report before you onboard or pay a vendor. External registries are not contacted. Call with optional asOf, projectName, vendor, documents, requirements, attestations and others. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, asOf, projectName, vendor, documents, requirements, attestations, evidence, openItems, checkedAt, purpose, assessment, blocksWorkflow, summary, counts.
- 2026-11-20 `vendor-compliance_document-completeness` changed (description) **meaning changed**
  - before: Compare a supplied document inventory with a buyer requirements list. Files are not fetched, and a present document is not treated as verified content. Price $0.03 USDC. POST /api/v1/vendor-compliance/document-completeness. An unpaid call returns the x402 payment terms and does not run.
  - after: Compare a supplied document inventory with a buyer requirements list before you onboard or pay a vendor. Files are not fetched, and a present document is not treated as verified content. Call with documents and requirements; optional asOf, projectName. Returns checkedAt, asOf, purpose, projectName, vendor, assessment, blocksWorkflow, summary, counts, findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you onboard or pay a vendor, documents, requirements, asOf, projectName, checkedAt, purpose, vendor, assessment, blocksWorkflow, summary, counts, findings, Check vendor document completeness, document completeness.

Full history: https://api.protogrid.dev/v1/servers/software.brainiac%2Fvendor-compliance/changes

## Remotes

- https://www.brainiac.software/mcp/vendor-compliance (streamable-http, auth none, reachable true, uptime30d 1)

## Packages

_none_

## Tools (7)

- `contact_us`: How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
- `vendor-compliance_contractor-closeout-check`: Compare buyer closeout requirements with supplied documents and attestations. Docs: https://www.brainiac.software/api/vendor-compliance/contractor-closeout-check Keywords: before you onboard or pay a vendor, requirements, asOf, projectName, vendor, documents, attestations, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Check contractor closeout.
- `vendor-compliance_contractor-prequalification`: Compare buyer qualification criteria with supplied vendor facts, documents, and evidence. Docs: https://www.brainiac.software/api/vendor-compliance/contractor-prequalification Keywords: before you onboard or pay a vendor, vendor, requirements, asOf, projectName, documents, evidence, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Prequalify a contractor.
- `vendor-compliance_document-completeness`: Compare a supplied document inventory with a buyer requirements list. Docs: https://www.brainiac.software/api/vendor-compliance/document-completeness Keywords: before you onboard or pay a vendor, documents, requirements, asOf, projectName, checkedAt, purpose, vendor, assessment, blocksWorkflow, summary, counts, findings, Check vendor document completeness, document completeness.
- `vendor-compliance_onboarding-precheck`: Compare a supplied vendor record, document list, and attestations with the buyer requirements. Docs: https://www.brainiac.software/api/vendor-compliance/onboarding-precheck Keywords: before you onboard or pay a vendor, vendor, asOf, projectName, documents, requirements, attestations, checkedAt, purpose, assessment, blocksWorkflow, summary, counts, findings, Precheck vendor onboarding.
- `vendor-compliance_report`: Consolidate supplied vendor information, documents, attestations, evidence, and open items into one requirements report. Docs: https://www.brainiac.software/api/vendor-compliance/report Keywords: before you onboard or pay a vendor, asOf, projectName, vendor, documents, requirements, attestations, evidence, openItems, checkedAt, purpose, assessment, blocksWorkflow, summary, counts.
- `vendor-compliance_subcontractor-payment-readiness`: List missing payment documents and caller-supplied open items. Docs: https://www.brainiac.software/api/vendor-compliance/subcontractor-payment-readiness Keywords: watchlist screen, sanctions list, denied party, before you onboard or pay a vendor, requirements, asOf, projectName, vendor, documents, openItems, checkedAt, purpose, assessment, blocksWorkflow, summary.
