# BRAINIAC Solar PV Design Calculations

> Paid Solar PV Design Calculations API via x402. Unpaid tool calls return 402.

- name: software.brainiac/solar-design
- version: 1.0.1
- connection class: R0 (autonomous)
- trust: 83/100 flags: no-repository
- quality: 80/100 (good)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/software.brainiac%2Fsolar-design
- tools: https://api.protogrid.dev/v1/servers/software.brainiac%2Fsolar-design/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "solar-design": {
      "type": "http",
      "url": "https://www.brainiac.software/mcp/solar-design"
    }
  }
}
```


## Trust

- hygiene: 80
- liveness: 100
- freshness: 100
- provenance: 55
- drivers: +dns-namespace +website +reachable +uptime-100% +updated-10d-ago -no-repository
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 80/100 (good)

### protocol: 75 (weight 25)

- warn `protocol.modern`: newest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
- n/a `protocol.stateless`: only applies to 2026-07-28 servers
- pass `protocol.transport`: streamable HTTP
- n/a `protocol.list_ttl`: only applies to 2026-07-28 servers

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 100 (weight 30)

- pass `tools.descriptions`: every tool has a description
- pass `tools.description_length`: descriptions are concise
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 15 of 15 tools declare readOnlyHint or destructiveHint
- pass `tools.directory_hints`: every tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
- pass `tools.token_cost`: about 7,295 tokens to load every tool
- pass `tools.api_dump`: tools are not a one-to-one API dump
- pass `tools.hidden_text`: no hidden text in tool names, descriptions, schemas or annotations
- pass `tools.poisoning`: no instructions aimed at the model in tool definitions

### stability: 50 (weight 15)

- warn `stability.changes`: 57 tool changes in 30 days
- fail `stability.rug_pull`: 16 tools kept their name but changed most of their description in 30 days; review before trusting them
- pass `stability.new_links`: no tool change named a new site

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: no npm or PyPI package

- tools: 15, about 7,295 tokens to load them all
- tool set hash: fe1186e42fe6e027fb2ed61ceae1b15c
- tools last changed: 2026-11-25T17:02:27.134Z
- badge: [![protogrid quality](https://protogrid.dev/badge/software.brainiac/solar-design.svg)](https://protogrid.dev/servers/software.brainiac/solar-design)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Definition changes

- 2026-11-25 `contact_us` added no new version (still 1.0.0)
  - How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
- 2026-11-23 `solar-design_pan-ond-parse` changed (description) **meaning changed**
  - before: Parse PVsyst PAN (module) and OND (inverter) text files into nested raw JSON and a normalised datasheet object before you finalise a solar PV design. Call with fileType and content. Returns raw and normalized (raw includes PVObject_). Carrying a payment-signature is not yet a charge. Settlement happens only on HTTP 2xx. Invalid JSON or schema returns HTTP 400 and is not charged. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, fileType, content, raw, normalized, Parse PVsyst PAN or OND text files, pan ond parse, Solar PV Design Calculations.
  - after: Parse PVsyst PAN (module) and OND (inverter) text files into nested raw JSON and a normalised datasheet object. Docs: https://www.brainiac.software/api/solar-design/pan-ond-parse Keywords: before you finalise a solar PV design, fileType, content, raw, normalized, Parse PVsyst PAN or OND text files, pan ond parse, Solar PV Design Calculations.
- 2026-11-23 `solar-design_module-spec-compare` changed (description) **meaning changed**
  - before: Normalise and compare module datasheet values for efficiency, W/m², temperature-adjusted power, price per watt and warranty retention before you finalise a solar PV design. Call with modules; optional referenceCellTemp. Returns modules and ranking (modules includes name, efficiency, wattsPerM2, pricePerW, pmaxAtRefTemp, warrantyYear25Retention, noct, pmaxNoct). HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, modules, referenceCellTemp, ranking, Compare module datasheet metrics, module spec compare, Solar PV Design Calculations, solar design.
  - after: Normalise and compare module datasheet values for efficiency, W/m², temperature-adjusted power, price per watt and warranty retention. Docs: https://www.brainiac.software/api/solar-design/module-spec-compare Keywords: before you finalise a solar PV design, modules, referenceCellTemp, ranking, Compare module datasheet metrics, module spec compare, Solar PV Design Calculations, solar design.
- 2026-11-23 `solar-design_nec-690-current` changed (description)
  - before: Compute PV circuit maximum current and minimum conductor ampacity using NEC 690.8 125% factors for the selected code edition before you finalise a solar PV design. Call with moduleIsc; optional edition, parallelStrings, continuousFactor. Returns maxCircuitCurrent, minConductorAmpacity, minOcpdRating, perStringMaxCurrent, and edition. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, moduleIsc, edition, parallelStrings, continuousFactor, maxCircuitCurrent, minConductorAmpacity, minOcpdRating, perStringMaxCurrent, Compute NEC 690.8 PV circuit current, nec 690 current.
  - after: Compute PV circuit maximum current and minimum conductor ampacity using NEC 690.8 125% factors for the selected code edition. Docs: https://www.brainiac.software/api/solar-design/nec-690-current Keywords: before you finalise a solar PV design, moduleIsc, edition, parallelStrings, continuousFactor, maxCircuitCurrent, minConductorAmpacity, minOcpdRating, perStringMaxCurrent, Compute NEC 690.8 PV circuit current, nec 690 current.
- 2026-11-23 `solar-design_module-layout-fit` changed (description)
  - before: Maximise the number of modules on a roof-face polygon with caller setbacks, orientation, gaps and obstruction polygons before you finalise a solar PV design. Call with roof, setback, and module; optional gap, orientations, obstructions, gridOffsets. Returns best, candidates, and placements (best includes orientation, count, rows, columns). HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, roof, setback, module, gap, orientations, obstructions, gridOffsets, best, candidates, placements, Fit modules onto a roof polygon, module layout fit.
  - after: Maximise the number of modules on a roof-face polygon with caller setbacks, orientation, gaps and obstruction polygons. Docs: https://www.brainiac.software/api/solar-design/module-layout-fit Keywords: before you finalise a solar PV design, roof, setback, module, gap, orientations, obstructions, gridOffsets, best, candidates, placements, Fit modules onto a roof polygon, module layout fit.
- 2026-11-23 `solar-design_financial-payback` changed (description)
  - before: Compute simple payback, NPV, IRR and LCOE from capex, incentives, year-1 energy, degradation, O&M and price escalation before you finalise a solar PV design. Call with capex, year1EnergyKwh, energyValuePerKwh, years, and discountRate; optional upfrontIncentives, degradation, energyEscalation, omPerYear, omEscalation. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, capex, year1EnergyKwh, energyValuePerKwh, years, discountRate, upfrontIncentives, degradation, energyEscalation, omPerYear, omEscalation, netCapex, year1CashFlow, npv, irr.
  - after: Compute simple payback, NPV, IRR and LCOE from capex, incentives, year-1 energy, degradation, O&M and price escalation. Docs: https://www.brainiac.software/api/solar-design/financial-payback Keywords: before you finalise a solar PV design, capex, year1EnergyKwh, energyValuePerKwh, years, discountRate, upfrontIncentives, degradation, energyEscalation, omPerYear, omEscalation, netCapex, year1CashFlow, npv, irr.
- 2026-11-23 `solar-design_tariff-savings` changed (description)
  - before: Compute bill savings from caller interval generation and load under a time-of-use tariff with export credit, net metering or no export value before you finalise a solar PV design. Call with loadKwh, generationKwh, and importPrice; optional intervalHours, exportMode, exportPrice, fixedCharges, demandCharge, billingPeriods. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, loadKwh, generationKwh, importPrice, intervalHours, exportMode, exportPrice, fixedCharges, demandCharge, billingPeriods, billWithoutPv, billWithPv, savings, importKwh, exportKwh.
  - after: Compute bill savings from caller interval generation and load under a time-of-use tariff with export credit, net metering or no export value. Docs: https://www.brainiac.software/api/solar-design/tariff-savings Keywords: before you finalise a solar PV design, loadKwh, generationKwh, importPrice, intervalHours, exportMode, exportPrice, fixedCharges, demandCharge, billingPeriods, billWithoutPv, billWithPv, savings, importKwh, exportKwh.
- 2026-11-23 `solar-design_battery-backup-sizing` changed (description)
  - before: Size battery energy and inverter continuous/surge power needed to back up critical loads for a target autonomy with DoD and efficiency derates before you finalise a solar PV design. Call with loads, autonomyHours, depthOfDischarge, and dischargeEfficiency; optional temperatureDerate, inverterMargin, pvRechargeKwhPerDay, simultaneousStart. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, loads, autonomyHours, depthOfDischarge, dischargeEfficiency, temperatureDerate, inverterMargin, pvRechargeKwhPerDay, simultaneousStart, energyNeededKwh, nominalCapacityKwh, inverterContinuousKw, inverterSurgeKw, Size battery backup energy and inverter power, battery backup sizing.
  - after: Size battery energy and inverter continuous/surge power needed to back up critical loads for a target autonomy with DoD and efficiency derates. Docs: https://www.brainiac.software/api/solar-design/battery-backup-sizing Keywords: before you finalise a solar PV design, loads, autonomyHours, depthOfDischarge, dischargeEfficiency, temperatureDerate, inverterMargin, pvRechargeKwhPerDay, simultaneousStart, energyNeededKwh, nominalCapacityKwh, inverterContinuousKw, inverterSurgeKw, Size battery backup energy and inverter power, battery backup sizing.
- 2026-11-23 `solar-design_system-loss-stack` changed (description)
  - before: Combine individual loss percentages into a total system loss using PVWatts multiplicative derating, with optional defaults for missing categories before you finalise a solar PV design. Call with optional losses, useDefaultsForMissing. Returns totalPercent, derate, and items (items includes name, percent, source). HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, losses, useDefaultsForMissing, totalPercent, derate, items, Combine PVWatts system loss percentages, system loss stack.
  - after: Combine individual loss percentages into a total system loss using PVWatts multiplicative derating, with optional defaults for missing categories. Docs: https://www.brainiac.software/api/solar-design/system-loss-stack Keywords: before you finalise a solar PV design, losses, useDefaultsForMissing, totalPercent, derate, items, Combine PVWatts system loss percentages, system loss stack.
- 2026-11-23 `solar-design_horizon-shading-loss` changed (description)
  - before: Estimate beam and isotropic sky-diffuse losses caused by a caller far-field horizon profile against sun positions and beam POA before you finalise a solar PV design. Call with horizon; optional records, latitude, longitude, elevation, times, beamPoa. Returns beamLossFraction, skyDiffuseLossFraction, and blockedHours. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise a solar PV design, horizon, records, latitude, longitude, elevation, times, beamPoa, beamLossFraction, skyDiffuseLossFraction, blockedHours, Estimate far-field horizon shading losses, horizon shading loss.
  - after: Estimate beam and isotropic sky-diffuse losses caused by a caller far-field horizon profile against sun positions and beam POA. Docs: https://www.brainiac.software/api/solar-design/horizon-shading-loss Keywords: before you finalise a solar PV design, horizon, records, latitude, longitude, elevation, times, beamPoa, beamLossFraction, skyDiffuseLossFraction, blockedHours, Estimate far-field horizon shading losses, horizon shading loss.

Full history: https://api.protogrid.dev/v1/servers/software.brainiac%2Fsolar-design/changes

## Remotes

- https://www.brainiac.software/mcp/solar-design (streamable-http, auth none, reachable true, uptime30d 1)

## Packages

_none_

## Tools (15)

- `contact_us`: How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
- `solar-design_battery-backup-sizing`: Size battery energy and inverter continuous/surge power needed to back up critical loads for a target autonomy with DoD and efficiency derates. Docs: https://www.brainiac.software/api/solar-design/battery-backup-sizing Keywords: before you finalise a solar PV design, loads, autonomyHours, depthOfDischarge, dischargeEfficiency, temperatureDerate, inverterMargin, pvRechargeKwhPerDay, simultaneousStart, energyNeededKwh, nominalCapacityKwh, inverterContinuousKw, inverterSurgeKw, Size battery backup energy and inverter power, battery backup sizing.
- `solar-design_dc-ac-ratio-check`: Compute the DC/AC ratio and optionally estimate AC energy and clipping from a caller DC power series with constant efficiency or a PVWatts inverter curve. Docs: https://www.brainiac.software/api/solar-design/dc-ac-ratio-check Keywords: before you finalise a solar PV design, dcNameplateKw, acRatingKw, inverterEfficiency, dcPowerSeriesKw, intervalHours, ratioWarnAbove, useCecCurve, dcAcRatio, warnings, acEnergyKwh, clippedEnergyKwh, clippingFraction, Check DC/AC ratio and inverter clipping, dc ac ratio check.
- `solar-design_energy-yield-estimate`: Estimate AC energy from caller POA irradiance and temperatures using the PVWatts v5 DC and inverter models with a transparent loss stack. Docs: https://www.brainiac.software/api/solar-design/energy-yield-estimate Keywords: before you finalise a solar PV design, dcNameplateW, gammaPdc, acRatingW, inverterNominalEfficiency, lossesPercent, temperatureModel, records, monthly, intervalHours, totalAcKwh, lossStack, accuracyNote, Estimate AC energy with PVWatts v5, energy yield estimate.
- `solar-design_financial-payback`: Compute simple payback, NPV, IRR and LCOE from capex, incentives, year-1 energy, degradation, O&M and price escalation. Docs: https://www.brainiac.software/api/solar-design/financial-payback Keywords: before you finalise a solar PV design, capex, year1EnergyKwh, energyValuePerKwh, years, discountRate, upfrontIncentives, degradation, energyEscalation, omPerYear, omEscalation, netCapex, year1CashFlow, npv, irr.
- `solar-design_horizon-shading-loss`: Estimate beam and isotropic sky-diffuse losses caused by a caller far-field horizon profile against sun positions and beam POA. Docs: https://www.brainiac.software/api/solar-design/horizon-shading-loss Keywords: before you finalise a solar PV design, horizon, records, latitude, longitude, elevation, times, beamPoa, beamLossFraction, skyDiffuseLossFraction, blockedHours, Estimate far-field horizon shading losses, horizon shading loss.
- `solar-design_module-layout-fit`: Maximise the number of modules on a roof-face polygon with caller setbacks, orientation, gaps and obstruction polygons. Docs: https://www.brainiac.software/api/solar-design/module-layout-fit Keywords: before you finalise a solar PV design, roof, setback, module, gap, orientations, obstructions, gridOffsets, best, candidates, placements, Fit modules onto a roof polygon, module layout fit.
- `solar-design_module-spec-compare`: Normalise and compare module datasheet values for efficiency, W/m², temperature-adjusted power, price per watt and warranty retention. Docs: https://www.brainiac.software/api/solar-design/module-spec-compare Keywords: before you finalise a solar PV design, modules, referenceCellTemp, ranking, Compare module datasheet metrics, module spec compare, Solar PV Design Calculations, solar design.
- `solar-design_nec-690-current`: Compute PV circuit maximum current and minimum conductor ampacity using NEC 690.8 125% factors for the selected code edition. Docs: https://www.brainiac.software/api/solar-design/nec-690-current Keywords: before you finalise a solar PV design, moduleIsc, edition, parallelStrings, continuousFactor, maxCircuitCurrent, minConductorAmpacity, minOcpdRating, perStringMaxCurrent, Compute NEC 690.8 PV circuit current, nec 690 current.
- `solar-design_pan-ond-parse`: Parse PVsyst PAN (module) and OND (inverter) text files into nested raw JSON and a normalised datasheet object. Docs: https://www.brainiac.software/api/solar-design/pan-ond-parse Keywords: before you finalise a solar PV design, fileType, content, raw, normalized, Parse PVsyst PAN or OND text files, pan ond parse, Solar PV Design Calculations.
- `solar-design_poa-irradiance-transpose`: Compute plane-of-array irradiance with isotropic, Hay-Davies or Perez sky models and NREL SPA solar geometry from caller irradiance records. Docs: https://www.brainiac.software/api/solar-design/poa-irradiance-transpose Keywords: before you finalise a solar PV design, latitude, longitude, tilt, azimuth, records, elevation, albedo, model, pressurePa, temperatureC, deltaT, poa irradiance transpose.
- `solar-design_row-spacing`: Compute row height, shadow gap, row pitch and ground coverage ratio that avoid row-to-row shading at a design sun position. Docs: https://www.brainiac.software/api/solar-design/row-spacing Keywords: before you finalise a solar PV design, moduleSlopeLength, tilt, arrayAzimuth, sun, designTimes, latitude, longitude, elevation, groundSlope, rowHeight, shadowGap, rowPitch, gcr, sunElevation.
- `solar-design_string-sizing`: Compute minimum and maximum modules per series string and maximum parallel strings per MPPT from module temperature coefficients, site temperatures and inverter DC limits. Docs: https://www.brainiac.software/api/solar-design/string-sizing Keywords: before you finalise a solar PV design, module, site, inverter, vocAtTmin, vmpAtTmax, vmpAtTmin, iscAtTmax, maxModulesBySystemVoltage, minModulesByMppt, maxModulesByMpptUpper, recommendedRange, maxStringsPerMppt, feasible, Size PV module strings for an inverter MPPT.
- `solar-design_system-loss-stack`: Combine individual loss percentages into a total system loss using PVWatts multiplicative derating, with optional defaults for missing categories. Docs: https://www.brainiac.software/api/solar-design/system-loss-stack Keywords: before you finalise a solar PV design, losses, useDefaultsForMissing, totalPercent, derate, items, Combine PVWatts system loss percentages, system loss stack.
- `solar-design_tariff-savings`: Compute bill savings from caller interval generation and load under a time-of-use tariff with export credit, net metering or no export value. Docs: https://www.brainiac.software/api/solar-design/tariff-savings Keywords: before you finalise a solar PV design, loadKwh, generationKwh, importPrice, intervalHours, exportMode, exportPrice, fixedCharges, demandCharge, billingPeriods, billWithoutPv, billWithPv, savings, importKwh, exportKwh.
