# BRAINIAC Electrical Engineering & Installation Intelligence

> Paid Electrical Engineering & Installation Intelligence API via x402. Unpaid tool calls return 402.

- name: software.brainiac/electrical-engineering
- version: 1.0.1
- connection class: R0 (autonomous)
- trust: 83/100 flags: no-repository
- quality: 76/100 (good)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/software.brainiac%2Felectrical-engineering
- tools: https://api.protogrid.dev/v1/servers/software.brainiac%2Felectrical-engineering/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "electrical-engineering": {
      "type": "http",
      "url": "https://www.brainiac.software/mcp/electrical-engineering"
    }
  }
}
```


## Trust

- hygiene: 80
- liveness: 100
- freshness: 100
- provenance: 55
- drivers: +dns-namespace +website +reachable +uptime-100% +updated-10d-ago -no-repository
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 76/100 (good)

### protocol: 75 (weight 25)

- warn `protocol.modern`: newest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
- n/a `protocol.stateless`: only applies to 2026-07-28 servers
- pass `protocol.transport`: streamable HTTP
- n/a `protocol.list_ttl`: only applies to 2026-07-28 servers

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 89 (weight 30)

- pass `tools.descriptions`: every tool has a description
- pass `tools.description_length`: descriptions are concise
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 11 of 11 tools declare readOnlyHint or destructiveHint
- pass `tools.directory_hints`: every tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
- fail `tools.token_cost`: about 28,462 tokens to load every tool, a large share of an agent's context
- pass `tools.api_dump`: tools are not a one-to-one API dump
- pass `tools.hidden_text`: no hidden text in tool names, descriptions, schemas or annotations
- pass `tools.poisoning`: no instructions aimed at the model in tool definitions

### stability: 50 (weight 15)

- warn `stability.changes`: 31 tool changes in 30 days
- fail `stability.rug_pull`: 19 tools kept their name but changed most of their description in 30 days; review before trusting them
- pass `stability.new_links`: no tool change named a new site

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: no npm or PyPI package

- tools: 11, about 28,462 tokens to load them all
- tool set hash: 68fd6ed7bc578b250cebcc2d26c77e22
- tools last changed: 2026-11-25T15:24:31.765Z
- badge: [![protogrid quality](https://protogrid.dev/badge/software.brainiac/electrical-engineering.svg)](https://protogrid.dev/servers/software.brainiac/electrical-engineering)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Definition changes

- 2026-11-25 `contact_us` added no new version (still 1.0.0)
  - How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
- 2026-11-23 `electrical-engineering_design-document-audit` changed (description, outputSchema)
  - before: Audit completeness of supplied electrical design inputs and aggregate load, balance, drop, cable, breaker, transformer, PF, generator, and EV checks before you finalise an electrical design. Does not invent code compliance. Call with optional text, json, csv, file, loads, cables and others. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Audit completeness of supplied electrical design inputs and aggregate load, balance, drop, cable, breaker, transformer, PF, generator, and EV checks. Docs: https://www.brainiac.software/api/electrical-engineering/design-document-audit Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_ev-charger-load-capacity-check` changed (description, outputSchema) **meaning changed**
  - before: Check EV charger design current against caller-supplied panel capacity and existing load before you finalise an electrical design. Continuous factors are used only when supplied. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, chargerCount, items, paidProviderUsed, apiKeyRequired, standardsInvented, codeComplianceClaimed. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Check EV charger design current against caller-supplied panel capacity and existing load. Docs: https://www.brainiac.software/api/electrical-engineering/ev-charger-load-capacity-check Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_generator-sizing-calculate` changed (description, outputSchema) **meaning changed**
  - before: Size required generator kVA from supplied load and caller diversity, reserve, and derate factors before you finalise an electrical design. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, generatorCount, items, paidProviderUsed, apiKeyRequired, standardsInvented, codeComplianceClaimed, and findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Size required generator kVA from supplied load and caller diversity, reserve, and derate factors. Docs: https://www.brainiac.software/api/electrical-engineering/generator-sizing-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_power-factor-correction-calculate` changed (description, outputSchema) **meaning changed**
  - before: Calculate required kVAR (and optional capacitance) to move from a supplied power factor to a supplied target before you finalise an electrical design. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, caseCount, items, paidProviderUsed, apiKeyRequired, standardsInvented, codeComplianceClaimed, and findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Calculate required kVAR (and optional capacitance) to move from a supplied power factor to a supplied target. Docs: https://www.brainiac.software/api/electrical-engineering/power-factor-correction-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_transformer-capacity-calculate` changed (description, outputSchema) **meaning changed**
  - before: Compare transformer rated kVA to supplied or schedule load kVA and report loading percentage before you finalise an electrical design. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, transformerCount, items, paidProviderUsed, apiKeyRequired, standardsInvented, codeComplianceClaimed, and findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Compare transformer rated kVA to supplied or schedule load kVA and report loading percentage. Docs: https://www.brainiac.software/api/electrical-engineering/transformer-capacity-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_breaker-rating-check` changed (description, outputSchema) **meaning changed**
  - before: Compare calculated design current to caller-supplied breaker ratings and continuous factors before you finalise an electrical design. Code rules are not invented. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, breakerCount, items, paidProviderUsed, apiKeyRequired, standardsInvented, codeComplianceClaimed. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Compare calculated design current to caller-supplied breaker ratings and continuous factors. Docs: https://www.brainiac.software/api/electrical-engineering/breaker-rating-check Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_cable-sizing-calculate` changed (description, outputSchema) **meaning changed**
  - before: Compare calculated design current to caller-supplied cable ampacity before you finalise an electrical design. Ampacity tables are not invented. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, cableCount, items, paidProviderUsed, apiKeyRequired, standardsInvented, codeComplianceClaimed, and findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Compare calculated design current to caller-supplied cable ampacity. Docs: https://www.brainiac.software/api/electrical-engineering/cable-sizing-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_voltage-drop-calculate` changed (description, outputSchema) **meaning changed**
  - before: Calculate voltage drop from supplied cable resistance/reactance, length, and load current before you finalise an electrical design. Cable tables are not invented. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, cableCount, items, paidProviderUsed, apiKeyRequired, standardsInvented, codeComplianceClaimed. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Calculate voltage drop from supplied cable resistance/reactance, length, and load current. Docs: https://www.brainiac.software/api/electrical-engineering/voltage-drop-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- 2026-11-23 `electrical-engineering_three-phase-load-balance-check` changed (description, outputSchema) **meaning changed**
  - before: Compare phase-leg currents from supplied loads and report imbalance percentage before you finalise an electrical design. Optional caller rule thresholds are compared when provided. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt, phaseA_A, phaseASupplied, phaseB_A, phaseBSupplied, phaseC_A, phaseCSupplied, maxPhaseA, maxPhaseSupplied. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
  - after: Compare phase-leg currents from supplied loads and report imbalance percentage. Docs: https://www.brainiac.software/api/electrical-engineering/three-phase-load-balance-check Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.

Full history: https://api.protogrid.dev/v1/servers/software.brainiac%2Felectrical-engineering/changes

## Remotes

- https://www.brainiac.software/mcp/electrical-engineering (streamable-http, auth none, reachable true, uptime30d 1)

## Packages

_none_

## Tools (11)

- `contact_us`: How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
- `electrical-engineering_breaker-rating-check`: Compare calculated design current to caller-supplied breaker ratings and continuous factors. Docs: https://www.brainiac.software/api/electrical-engineering/breaker-rating-check Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_cable-sizing-calculate`: Compare calculated design current to caller-supplied cable ampacity. Docs: https://www.brainiac.software/api/electrical-engineering/cable-sizing-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_design-document-audit`: Audit completeness of supplied electrical design inputs and aggregate load, balance, drop, cable, breaker, transformer, PF, generator, and EV checks. Docs: https://www.brainiac.software/api/electrical-engineering/design-document-audit Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_ev-charger-load-capacity-check`: Check EV charger design current against caller-supplied panel capacity and existing load. Docs: https://www.brainiac.software/api/electrical-engineering/ev-charger-load-capacity-check Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_generator-sizing-calculate`: Size required generator kVA from supplied load and caller diversity, reserve, and derate factors. Docs: https://www.brainiac.software/api/electrical-engineering/generator-sizing-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_load-schedule-calculate`: Calculate kW, kVA, and current for caller-supplied loads using supplied voltage and power factor. Docs: https://www.brainiac.software/api/electrical-engineering/load-schedule-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_power-factor-correction-calculate`: Calculate required kVAR (and optional capacitance) to move from a supplied power factor to a supplied target. Docs: https://www.brainiac.software/api/electrical-engineering/power-factor-correction-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_three-phase-load-balance-check`: Compare phase-leg currents from supplied loads and report imbalance percentage. Docs: https://www.brainiac.software/api/electrical-engineering/three-phase-load-balance-check Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_transformer-capacity-calculate`: Compare transformer rated kVA to supplied or schedule load kVA and report loading percentage. Docs: https://www.brainiac.software/api/electrical-engineering/transformer-capacity-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
- `electrical-engineering_voltage-drop-calculate`: Calculate voltage drop from supplied cable resistance/reactance, length, and load current. Docs: https://www.brainiac.software/api/electrical-engineering/voltage-drop-calculate Keywords: before you finalise an electrical design, text, csv, file, loads, cables, breakers, transformers, powerFactorCases, generators, chargers, rules, system, asOf, checkedAt.
