# BRAINIAC Construction Site Operations

> Paid Construction Site Operations API via x402. Unpaid tool calls return 402.

- name: software.brainiac/construction-site-operations
- version: 1.0.1
- connection class: R0 (autonomous)
- trust: 83/100 flags: no-repository
- quality: 78/100 (good)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/software.brainiac%2Fconstruction-site-operations
- tools: https://api.protogrid.dev/v1/servers/software.brainiac%2Fconstruction-site-operations/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "construction-site-operations": {
      "type": "http",
      "url": "https://www.brainiac.software/mcp/construction-site-operations"
    }
  }
}
```


## Trust

- hygiene: 80
- liveness: 100
- freshness: 100
- provenance: 55
- drivers: +dns-namespace +website +reachable +uptime-100% +updated-10d-ago -no-repository
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 78/100 (good)

### protocol: 75 (weight 25)

- warn `protocol.modern`: newest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
- n/a `protocol.stateless`: only applies to 2026-07-28 servers
- pass `protocol.transport`: streamable HTTP
- n/a `protocol.list_ttl`: only applies to 2026-07-28 servers

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 94 (weight 30)

- pass `tools.descriptions`: every tool has a description
- pass `tools.description_length`: descriptions are concise
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 9 of 9 tools declare readOnlyHint or destructiveHint
- pass `tools.directory_hints`: every tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
- warn `tools.token_cost`: about 15,967 tokens to load every tool
- pass `tools.api_dump`: tools are not a one-to-one API dump
- pass `tools.hidden_text`: no hidden text in tool names, descriptions, schemas or annotations
- pass `tools.poisoning`: no instructions aimed at the model in tool definitions

### stability: 50 (weight 15)

- warn `stability.changes`: 25 tool changes in 30 days
- fail `stability.rug_pull`: 14 tools kept their name but changed most of their description in 30 days; review before trusting them
- pass `stability.new_links`: no tool change named a new site

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: no npm or PyPI package

- tools: 9, about 15,967 tokens to load them all
- tool set hash: b90c7e622f946738d7d5a66630c5bd97
- tools last changed: 2026-11-25T17:01:06.313Z
- badge: [![protogrid quality](https://protogrid.dev/badge/software.brainiac/construction-site-operations.svg)](https://protogrid.dev/servers/software.brainiac/construction-site-operations)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Definition changes

- 2026-11-25 `contact_us` added no new version (still 1.0.0)
  - How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
- 2026-11-23 `construction-site-operations_report` changed (description, outputSchema) **meaning changed**
  - before: Combine daily reports, progress deviations, recorded and inferred delays, RFIs, instructions, deliveries, and change comparisons from supplied site records when reviewing site progress or a change. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, asOf, reportCount, lateActivityCount, recordedDelayCount, inferredDelayCount. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, reportCount, lateActivityCount.
  - after: Combine daily reports, progress deviations, recorded and inferred delays, RFIs, instructions, deliveries, and change comparisons from supplied site records. Docs: https://www.brainiac.software/api/construction-site-operations/report Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, reportCount, lateActivityCount.
- 2026-11-23 `construction-site-operations_change-impact` changed (description, outputSchema) **meaning changed**
  - before: Compare change instructions with supplied scope and programme dates when reviewing site progress or a change. Linked schedule impact is labeled inferred and is not a liability finding. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, changeCount, items, delayInvented, entitlementDetermined, liabilityDetermined. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, changeCount, items.
  - after: Compare change instructions with supplied scope and programme dates. Docs: https://www.brainiac.software/api/construction-site-operations/change-impact Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, changeCount, items.
- 2026-11-23 `construction-site-operations_material-delivery-reconcile` changed (description, outputSchema)
  - before: Reconcile expected and delivered material records, flagging missing deliveries and short quantities from supplied dates and counts when reviewing site progress or a change. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, missingCount, shortCount, items, delayInvented, entitlementDetermined, liabilityDetermined. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, missingCount, shortCount.
  - after: Reconcile expected and delivered material records, flagging missing deliveries and short quantities from supplied dates and counts. Docs: https://www.brainiac.software/api/construction-site-operations/material-delivery-reconcile Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, missingCount, shortCount.
- 2026-11-23 `construction-site-operations_instruction-extract` changed (description, outputSchema) **meaning changed**
  - before: Extract dates, issuers, locations, referenced activities, and change flags from supplied site instructions when reviewing site progress or a change. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, changeCount, items, delayInvented, entitlementDetermined, liabilityDetermined, and findings. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, changeCount, items.
  - after: Extract dates, issuers, locations, referenced activities, and change flags from supplied site instructions. Docs: https://www.brainiac.software/api/construction-site-operations/instruction-extract Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, changeCount, items.
- 2026-11-23 `construction-site-operations_request-for-information-track` changed (description, outputSchema) **meaning changed**
  - before: Track RFI asked/due/answered dates and identify unresolved or overdue items from supplied statuses when reviewing site progress or a change. Contractual entitlement is not decided. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, openCount, overdueCount, items, delayInvented, entitlementDetermined, liabilityDetermined. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, openCount, overdueCount.
  - after: Track RFI asked/due/answered dates and identify unresolved or overdue items from supplied statuses. Docs: https://www.brainiac.software/api/construction-site-operations/request-for-information-track Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, openCount, overdueCount.
- 2026-11-23 `construction-site-operations_delay-event-detect` changed (description, outputSchema)
  - before: Collect recorded delay rows and daily-report delay wording, and separately label impacts inferred from baseline versus actual dates when reviewing site progress or a change. Liability is not determined. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, recordedCount, inferredCount, items, delayInvented, entitlementDetermined. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, recordedCount, inferredCount.
  - after: Collect recorded delay rows and daily-report delay wording, and separately label impacts inferred from baseline versus actual dates. Docs: https://www.brainiac.software/api/construction-site-operations/delay-event-detect Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, recordedCount, inferredCount.
- 2026-11-23 `construction-site-operations_progress-analyze` changed (description, outputSchema) **meaning changed**
  - before: Compare supplied baseline and actual activity dates to identify schedule deviations when reviewing site progress or a change. Inferred impact is labeled and is not an entitlement determination. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, lateCount, items, delayInvented, entitlementDetermined, liabilityDetermined. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, lateCount, items.
  - after: Compare supplied baseline and actual activity dates to identify schedule deviations. Docs: https://www.brainiac.software/api/construction-site-operations/progress-analyze Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, lateCount, items.
- 2026-11-23 `construction-site-operations_daily-report-parse` changed (description, outputSchema) **meaning changed**
  - before: Copy supplied daily reports into structured rows with dates, locations, authors, workforce, and referenced activities when reviewing site progress or a change. Delay wording is flagged as recorded narrative only. Call with optional text, json, csv, file, reports, activities and others. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, delayInvented, entitlementDetermined.
  - after: Copy supplied daily reports into structured rows with dates, locations, authors, workforce, and referenced activities. Docs: https://www.brainiac.software/api/construction-site-operations/daily-report-parse Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, delayInvented, entitlementDetermined.
- 2026-11-20 `construction-site-operations_report` changed (description) **meaning changed**
  - before: Combine daily reports, progress deviations, recorded and inferred delays, RFIs, instructions, deliveries, and change comparisons from supplied site records. Price $0.12 USDC. POST /api/v1/construction-site-operations/report. An unpaid call returns the x402 payment terms and does not run.
  - after: Combine daily reports, progress deviations, recorded and inferred delays, RFIs, instructions, deliveries, and change comparisons from supplied site records when reviewing site progress or a change. Call with optional text, json, csv, file, reports, activities and others. Returns checkedAt, asOf, reportCount, lateActivityCount, recordedDelayCount, inferredDelayCount. HTTP 200 with status complete, partial, or failed is charged at the full listed price. HTTP 4xx/5xx are not charged. Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, reportCount, lateActivityCount.

Full history: https://api.protogrid.dev/v1/servers/software.brainiac%2Fconstruction-site-operations/changes

## Remotes

- https://www.brainiac.software/mcp/construction-site-operations (streamable-http, auth none, reachable true, uptime30d 1)

## Packages

_none_

## Tools (9)

- `construction-site-operations_change-impact`: Compare change instructions with supplied scope and programme dates. Docs: https://www.brainiac.software/api/construction-site-operations/change-impact Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, changeCount, items.
- `construction-site-operations_daily-report-parse`: Copy supplied daily reports into structured rows with dates, locations, authors, workforce, and referenced activities. Docs: https://www.brainiac.software/api/construction-site-operations/daily-report-parse Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, delayInvented, entitlementDetermined.
- `construction-site-operations_delay-event-detect`: Collect recorded delay rows and daily-report delay wording, and separately label impacts inferred from baseline versus actual dates. Docs: https://www.brainiac.software/api/construction-site-operations/delay-event-detect Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, recordedCount, inferredCount.
- `construction-site-operations_instruction-extract`: Extract dates, issuers, locations, referenced activities, and change flags from supplied site instructions. Docs: https://www.brainiac.software/api/construction-site-operations/instruction-extract Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, changeCount, items.
- `construction-site-operations_material-delivery-reconcile`: Reconcile expected and delivered material records, flagging missing deliveries and short quantities from supplied dates and counts. Docs: https://www.brainiac.software/api/construction-site-operations/material-delivery-reconcile Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, missingCount, shortCount.
- `construction-site-operations_progress-analyze`: Compare supplied baseline and actual activity dates to identify schedule deviations. Docs: https://www.brainiac.software/api/construction-site-operations/progress-analyze Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, lateCount, items.
- `construction-site-operations_report`: Combine daily reports, progress deviations, recorded and inferred delays, RFIs, instructions, deliveries, and change comparisons from supplied site records. Docs: https://www.brainiac.software/api/construction-site-operations/report Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, reportCount, lateActivityCount.
- `construction-site-operations_request-for-information-track`: Track RFI asked/due/answered dates and identify unresolved or overdue items from supplied statuses. Docs: https://www.brainiac.software/api/construction-site-operations/request-for-information-track Keywords: when reviewing site progress or a change, text, csv, file, reports, activities, delays, rfis, instructions, deliveries, scope, asOf, checkedAt, openCount, overdueCount.
- `contact_us`: How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
