# io.github.physics-star-cat/databutler-uk-exam-dates

> UK GCSE and A-level exam dates, results days, entry deadlines and spec changes.

- name: io.github.physics-star-cat/databutler-uk-exam-dates
- version: 1.0.0
- connection class: R0 (autonomous)
- trust: 93/100 flags: duplicate-repo
- quality: 88/100 (good)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/io.github.physics-star-cat%2Fdatabutler-uk-exam-dates
- tools: https://api.protogrid.dev/v1/servers/io.github.physics-star-cat%2Fdatabutler-uk-exam-dates/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "databutler-uk-exam-dates": {
      "type": "http",
      "url": "https://databutler.dev/api/mcp/uk-exam-dates"
    }
  }
}
```


## Trust

- hygiene: 80
- liveness: 100
- freshness: 100
- provenance: 90
- drivers: +repository +namespace-matches-repo +website +reachable +uptime-100% +updated-15d-ago -duplicate-repo(16 names)
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 88/100 (good)

### protocol: 75 (weight 25)

- warn `protocol.modern`: newest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
- n/a `protocol.stateless`: only applies to 2026-07-28 servers
- pass `protocol.transport`: streamable HTTP
- n/a `protocol.list_ttl`: only applies to 2026-07-28 servers

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 93 (weight 30)

- pass `tools.descriptions`: every tool has a description
- warn `tools.description_length`: 1 tools have descriptions over 1,024 characters, which crowds the context
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 1 of 1 tools declare readOnlyHint or destructiveHint
- pass `tools.directory_hints`: every tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
- pass `tools.token_cost`: about 437 tokens to load every tool
- pass `tools.api_dump`: tools are not a one-to-one API dump

### stability: 100 (weight 15)

- pass `stability.changes`: no tool changes in 30 days
- pass `stability.rug_pull`: no tool changed its meaning under the same name

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: no npm or PyPI package

- tools: 1, about 437 tokens to load them all
- tool set hash: 94ea57d2eb4289138b80613bfacd790e
- badge: [![protogrid quality](https://protogrid.dev/badge/io.github.physics-star-cat/databutler-uk-exam-dates.svg)](https://protogrid.dev/servers/io.github.physics-star-cat/databutler-uk-exam-dates)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Tool changes

_No tool definition changes recorded._

## Remotes

- https://databutler.dev/api/mcp/uk-exam-dates (streamable-http, auth none, reachable true, uptime30d 1)

## Packages

_none_

## Tools (1)

- `uk_exam_dates`: UK exam calendar dates verified against JCQ and the exam boards' own documents: results days (A-level 12 August 2027, GCSE 19 August 2027, November 2026 GCSE resits 13 January 2027, Scotland 10 August 2027), the summer 2027 exam timetable (JCQ common window 10 May – 22 June, contingency day 23 June 2027; per board — AQA, Pearson Edexcel, Cambridge OCR and WJEC/Eduqas, all final — the dates of GCSE Maths papers 1–3, English Language papers 1–2, Combined Science papers and A-level Maths papers), entry deadlines (JCQ 21 February 2027) with each board's late and very-late entry fee dates and multipliers, and announced specification changes (first-teaching and first-exam years, DfE reform timetable, Ofqual decisions). Input kind (results, timetable, deadlines, spec-changes; omitted → the listing), optional board (jcq, aqa, pearson/edexcel, ocr, wjec/eduqas, sqa, ofqual, dfe) and qualification (gcse, a-level). Every figure carries its source document, the quoted timetable row, verifiedDate (2026-10-04) and, where the board's 2026 document is still served, the summer-2026 date as previous. An unknown kind, board or qualification answers covered:false with the nearest keys.
