# LienDeadline

> Statute-cited lien and notice deadlines for material suppliers; lien guides for 50 states and DC.

- name: io.github.LienDeadline/liendeadline-mcp
- version: 0.5.4
- connection class: R0 (autonomous)
- trust: 97/100
- quality: 83/100 (good)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/io.github.LienDeadline%2Fliendeadline-mcp
- tools: https://api.protogrid.dev/v1/servers/io.github.LienDeadline%2Fliendeadline-mcp/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "liendeadline-mcp": {
      "type": "http",
      "url": "https://mcp.liendeadline.com/mcp"
    }
  }
}
```


## Trust

- hygiene: 100
- liveness: 100
- freshness: 100
- provenance: 90
- drivers: +repository +namespace-matches-repo +website +reachable +uptime-100% +updated-13d-ago
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 83/100 (good)

### protocol: 75 (weight 25)

- warn `protocol.modern`: newest supported version is 2025-11-25; 2026-07-28 not supported, older versions are deprecated until 2027-07-28
- n/a `protocol.stateless`: only applies to 2026-07-28 servers
- pass `protocol.transport`: streamable HTTP
- n/a `protocol.list_ttl`: only applies to 2026-07-28 servers

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 93 (weight 30)

- pass `tools.descriptions`: every tool has a description
- warn `tools.description_length`: 1 tools have descriptions over 1,024 characters, which crowds the context
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 5 of 5 tools declare readOnlyHint or destructiveHint
- pass `tools.directory_hints`: every tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
- pass `tools.token_cost`: about 2,409 tokens to load every tool
- pass `tools.api_dump`: tools are not a one-to-one API dump

### stability: 75 (weight 15)

- warn `stability.changes`: 10 tool changes in 30 days
- pass `stability.rug_pull`: no tool changed its meaning under the same name

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: deps.dev does not know liendeadline-mcp@0.5.4

- tools: 5, about 2,409 tokens to load them all
- tool set hash: 79899edcd90977e19425f76a0740f00f
- tools last changed: 2026-10-12T09:28:53.811Z
- badge: [![protogrid quality](https://protogrid.dev/badge/io.github.LienDeadline/liendeadline-mcp.svg)](https://protogrid.dev/servers/io.github.LienDeadline/liendeadline-mcp)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Tool changes

- 2026-10-12 `calculate_supplier_deadlines_v3` changed (description, annotations)
  - before: Evaluates supplier-events-v3 project facts against the exact discovered rule and question identities. Returns independent notice and lien outcomes with sources and an exact nested input echo. Only calculated outcomes contain deadline dates; review candidates remain unresolved. Stale identities return 409, unavailable reviewed sources return 503. Public, stateless and read-only; no key, stored records, sent notices or filed liens.
  - after: Evaluates supplier-events-v3 project facts against the exact discovered rule and question identities. Returns independent notice and lien outcomes with sources and an exact nested input echo. Only calculated outcomes contain statutory deadline dates; review candidates remain unresolved. An optional verified action_by is a Conservative action date planning target under qualified review; the statutory deadline and countdown remain unresolved, with explanation, sources and warnings. Stale identities return 409, unavailable reviewed sources return 503. Requires a customer key and consumes one plan calculation unit. No project is saved, notice sent or lien filed.
- 2026-10-12 `get_supplier_questions` changed (description)
  - before: Returns the current supplier-events-v3 scope support, jurisdiction-specific yes/no/unknown event questions, date policies, sources and exact rule/question identities for a material supplier. Public and read-only; no key or delivery dates needed. A 503 means the reviewed source is unavailable. Approval of research alone does not activate a scope.
  - after: Returns the current supplier-events-v3 scope support, jurisdiction-specific yes/no/unknown event questions, date policies, sources and exact rule/question identities for a material supplier. Requires a customer key; no delivery dates needed. Discovery does not consume calculation quota. A 503 means the reviewed source is unavailable. Approval of research alone does not activate a scope.
- 2026-10-12 `calculate_supplier_deadlines` changed (description, annotations)
  - before: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Available baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. The Florida final-payment answer holds the notice for suppliers not hired by the owner. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Public, stateless and read-only: no key needed, nothing is stored, and no notice is sent or lien filed. Not legal advice.
  - after: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Available baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. The Florida final-payment answer holds the notice for suppliers not hired by the owner. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Requires a customer key and consumes one plan calculation unit. No project is saved, notice sent or lien filed. Not legal advice.
- 2026-10-07 `calculate_supplier_deadlines` changed (description, inputSchema)
  - before: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Available baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Public, stateless and read-only: no key needed, nothing is stored, and no notice is sent or lien filed. Not legal advice.
  - after: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Available baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. The Florida final-payment answer holds the notice for suppliers not hired by the owner. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Public, stateless and read-only: no key needed, nothing is stored, and no notice is sent or lien filed. Not legal advice.
- 2026-10-06 `calculate_supplier_deadlines_v3` added
  - Evaluates supplier-events-v3 project facts against the exact discovered rule and question identities. Returns independent notice and lien outcomes with sources and an exact nested input echo. Only calculated outcomes contain deadline dates; review candidates remain unresolved. Stale identities return 409, unavailable reviewed sources return 503. Public, stateless and read-only; no key, stored records, sent notices or filed liens.
- 2026-10-06 `get_supplier_questions` added
  - Returns the current supplier-events-v3 scope support, jurisdiction-specific yes/no/unknown event questions, date policies, sources and exact rule/question identities for a material supplier. Public and read-only; no key or delivery dates needed. A 503 means the reviewed source is unavailable. Approval of research alone does not activate a scope.
- 2026-10-06 `calculate_supplier_deadlines` changed (description)
  - before: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Reviewed baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Public, stateless and read-only: no key needed, nothing is stored, and no notice is sent or lien filed. Not legal advice.
  - after: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Available baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Public, stateless and read-only: no key needed, nothing is stored, and no notice is sent or lien filed. Not legal advice.
- 2026-10-04 `list_state_lien_guides` changed (description, annotations)
  - before: Lists every published state lien guide in one response, without pagination: count plus state_code, title and slug for all 50 states and DC, in alphabetical order by state name. Use it to find a valid code before calling get_state_lien_guide. It lists editorial guides only, not where calculate_supplier_deadlines produces dates. Takes no parameters. Public and read-only; no key needed.
  - after: Lists every published state lien guide in one response, without pagination: count plus state_code, title and slug for all 50 states and DC, in alphabetical order by state name. It lists editorial guides only and does not indicate which states have calculated deadlines. Takes no parameters. Public and read-only; no key needed.
- 2026-10-04 `get_state_lien_guide` changed (description, annotations)
  - before: Returns LienDeadline's editorial mechanics lien and preliminary notice guide for one state or DC: rules (rule summary with statute citations), deadline_rows (deadline table), faqs (common questions) and source_url (the guide's web page), roughly 4 KB of JSON. Use it when the user asks how a state's lien or notice rules work, why a deadline falls where it does, or which statute applies. Call list_state_lien_guides first if you need the valid codes; an unknown code returns an error. Editorial reference, not a calculation. Do not derive filing dates from the day counts; use calculate_supplier_deadlines, and treat anything it does not calculate as requiring qualified review. Public and read-only; no key needed.
  - after: Returns LienDeadline's editorial mechanics lien and preliminary notice guide for one state or DC: rules (rule summary with statute citations), deadline_rows (deadline table), faqs (common questions) and source_url (the guide's web page), roughly 4 KB of JSON. For questions about how a state's lien or notice rules work, why a deadline falls where it does, or which statute applies. An unknown state code returns an error. The guide is an editorial reference, not a calculation: its day counts are summaries, not computed deadlines. Public and read-only; no key needed.
- 2026-10-04 `calculate_supplier_deadlines` changed (description, inputSchema, annotations)
  - before: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2). Use it whenever the user needs dates; use get_state_lien_guide to explain the rules behind them. Reviewed baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is an answer, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) asks florida_final_payment_status and florida_termination_status; Kansas (KS) asks kansas_extension_status; these are rejected for other states. Answer each yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. A Florida event date is accepted only with the matching yes answer. Ask the user for missing facts instead of guessing, and never use an invoice date as a delivery date. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Public, stateless and read-only: no key needed, nothing is stored, and no notice is sent or lien filed. Not legal advice.
  - after: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Reviewed baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Public, stateless and read-only: no key needed, nothing is stored, and no notice is sent or lien filed. Not legal advice.

Full history: https://api.protogrid.dev/v1/servers/io.github.LienDeadline%2Fliendeadline-mcp/changes

## Dependencies

- npm liendeadline-mcp@0.5.4: unknown

Dependency graphs from deps.dev; advisories from OSV.dev, including the GitHub Advisory Database and the PyPI Advisory Database; all CC BY 4.0.

## Remotes

- https://mcp.liendeadline.com/mcp (streamable-http, auth none, reachable true, uptime30d 1)

## Packages

- npm liendeadline-mcp@0.5.4 secrets: LIENDEADLINE_API_KEY

## Tools (5)

- `calculate_supplier_deadlines`: Calculates a construction material supplier's preliminary notice and lien filing deadlines from delivery events (contract supplier-events-v2), for questions that need deadline dates. Available baselines cover Florida and Kansas private projects; other states and public projects return review_required, which is a valid result, not an error. How the parameters depend on each other: last_delivery_date is required when deliveries_complete is true. Florida (FL) takes florida_final_payment_status and florida_termination_status; Kansas (KS) takes kansas_extension_status; these are rejected for other states. Each takes yes, no or unknown: an omitted or unknown answer keeps the affected deadline under review, and a blanket review flag is not accepted. The Florida final-payment answer holds the notice for suppliers not hired by the owner. A Florida event date is accepted only with the matching yes answer. Delivery dates are furnishing dates, not invoice dates. Returns JSON with an overall status (calculated or review_required), preliminary_notice and lien_filing (each with its own status: calculated, not_required, review_required or awaiting_final_delivery, plus deadline, days_from_now, description and statute source_url), critical_warnings, statute_citations, an exact echo of the submitted inputs and a disclaimer. Invalid or contradictory facts return an error naming the field before any API call. Requires a customer key and consumes one plan calculation unit. No project is saved, notice sent or lien filed. Not legal advice.
- `calculate_supplier_deadlines_v3`: Evaluates supplier-events-v3 project facts against the exact discovered rule and question identities. Returns independent notice and lien outcomes with sources and an exact nested input echo. Only calculated outcomes contain statutory deadline dates; review candidates remain unresolved. An optional verified action_by is a Conservative action date planning target under qualified review; the statutory deadline and countdown remain unresolved, with explanation, sources and warnings. Stale identities return 409, unavailable reviewed sources return 503. Requires a customer key and consumes one plan calculation unit. No project is saved, notice sent or lien filed.
- `get_state_lien_guide`: Returns LienDeadline's editorial mechanics lien and preliminary notice guide for one state or DC: rules (rule summary with statute citations), deadline_rows (deadline table), faqs (common questions) and source_url (the guide's web page), roughly 4 KB of JSON. For questions about how a state's lien or notice rules work, why a deadline falls where it does, or which statute applies. An unknown state code returns an error. The guide is an editorial reference, not a calculation: its day counts are summaries, not computed deadlines. Public and read-only; no key needed.
- `get_supplier_questions`: Returns the current supplier-events-v3 scope support, jurisdiction-specific yes/no/unknown event questions, date policies, sources and exact rule/question identities for a material supplier. Requires a customer key; no delivery dates needed. Discovery does not consume calculation quota. A 503 means the reviewed source is unavailable. Approval of research alone does not activate a scope.
- `list_state_lien_guides`: Lists every published state lien guide in one response, without pagination: count plus state_code, title and slug for all 50 states and DC, in alphabetical order by state name. It lists editorial guides only and does not indicate which states have calculated deadlines. Takes no parameters. Public and read-only; no key needed.
