# whenship

> When will it ship? A live what-if Gantt for small teams: realistic dates and deadline risk.

- name: io.github.HamedShams/whenship
- version: 1.6.3
- connection class: R0 (autonomous)
- trust: 97/100
- quality: 96/100 (strong)
- owner: not claimed
- descriptor: https://api.protogrid.dev/v1/servers/io.github.HamedShams%2Fwhenship
- tools: https://api.protogrid.dev/v1/servers/io.github.HamedShams%2Fwhenship/tools

**An agent can connect right now, no human step.** Remote endpoint, no authentication, reachable on the last probe.

## Connection (mcpServers)

```json
{
  "mcpServers": {
    "whenship": {
      "type": "http",
      "url": "https://whenship.app/mcp"
    }
  }
}
```


## Trust

- hygiene: 100
- liveness: 100
- freshness: 100
- provenance: 90
- drivers: +repository +namespace-matches-repo +website +reachable +uptime-100% +updated-8d-ago
- Derived from observable signals (official registry feed and our own credential-free probes); no code audit performed.

## Quality 96/100 (strong)

### protocol: 88 (weight 25)

- pass `protocol.modern`: supports 2026-07-28 (server/discover)
- pass `protocol.stateless`: answers without a session
- pass `protocol.transport`: streamable HTTP
- warn `protocol.list_ttl`: tools/list declares ttlMs 0, so clients re-fetch it on every use

### authorization: n/a (weight 15)

- n/a `auth.prm`, `auth.as_metadata`, `auth.cimd`: no remote uses OAuth
- n/a `auth.secret_in_url`: no templated URL

### tool hygiene: 100 (weight 30)

- pass `tools.descriptions`: every tool has a description
- pass `tools.description_length`: descriptions are concise
- pass `tools.schemas`: every tool has an object input schema
- pass `tools.annotations`: 4 of 4 tools declare readOnlyHint or destructiveHint
- pass `tools.directory_hints`: every tool declares readOnlyHint, destructiveHint, idempotentHint and openWorldHint
- pass `tools.token_cost`: about 5,603 tokens to load every tool
- pass `tools.api_dump`: tools are not a one-to-one API dump
- pass `tools.hidden_text`: no hidden text in tool, prompt or resource definitions
- pass `tools.poisoning`: no instructions aimed at the model in tool, prompt or resource definitions

### stability: 100 (weight 15)

- pass `stability.changes`: no tool changes in 30 days
- pass `stability.rug_pull`: no tool changed its meaning under the same name
- pass `stability.new_links`: no tool change named a new site

### dependencies: n/a (weight 15)

- n/a `deps.known_vulns`, `deps.mcp_sdk_version`, `deps.resolvable`: deps.dev does not know whenship@1.6.3

- tools: 4, about 5,603 tokens to load them all
- tool set hash: 00ae9adb47c534cda63db1e1b39266f1
- badge: [![protogrid quality](https://protogrid.dev/badge/io.github.HamedShams/whenship.svg)](https://protogrid.dev/servers/io.github.HamedShams/whenship)
- Checks run on what our credential-free, read-only probes observe; tools are never called and no code audit is performed.

### Definition changes

_No changes to tool, prompt or resource template definitions recorded._

## Dependencies

- npm whenship@1.6.3: unknown

Dependency graphs from deps.dev; advisories from OSV.dev, including the GitHub Advisory Database and the PyPI Advisory Database; all CC BY 4.0.

## Remotes

- https://whenship.app/mcp (streamable-http, auth none, reachable true, uptime30d 1)

## Packages

- npm whenship@1.6.3

## Tools (4)

- `export_plan`: Returns the plan as a file: json (the whenship save file, re-openable on the website and in Claude), csv (one row per item with dates), ics (calendar with finish dates and deadlines), markdown (the report), or link (a share link with the whole plan inside it). Spreadsheet (XLSX) and image exports are in the chart’s Export menu.
- `find_options`: Searches realistic changes that would meet more deadlines or make the plan sturdier: reordering, deferring undated work, more availability, one more person, or negotiating a deadline. Every option is re-planned exactly, and returned with its effect and the changes that would apply it (usable with what_if).
- `show_plan`: Schedules work for a small team and shows an interactive Gantt chart: finish dates per item, deadline risk (on time / tight / late, with a rough chance), what sets the end date, and the best options to meet more deadlines. Use for "when will this ship", "can we make these deadlines", prioritising several projects or clients, and capacity planning. Input: people or teams (lanes) and items in priority order with effort in working days. Returns a text summary plus the chart, which the user edits directly. `changes` apply edits first (the answer compares before and after); `suggestions` are options of your own (title + changes), each measured exactly and shown in the chart for the user to apply.
- `what_if`: Compares a plan before and after a change and reports which finish dates move and which deadlines are newly met or missed. The change is a list of simple `changes` (move an item to a position, change effort, set or clear a deadline or a can't-start-before date, change a lane's people or availability, add a person or team, add a holiday, change working days, remove an item, change the start date), or an `alternative`: a whole changed copy of the plan, for anything else (moving work between people, splitting, cutting or adding items, dependencies, hand-offs, several changes at once). Returns the comparison and the changed plan. To apply a change and update the chart in one step, call show_plan with the same `changes` instead.

## Prompts and resources

### Prompts (1)

- `` plan ``: Turn a list of work, people and deadlines into a whenship plan and chart.

### Resources (1)

- `` ui://whenship/app.html ``: Interactive Gantt chart for a whenship plan
